Planning application

Bramshill House Bramshill Park Bramshill Hook RG27 0JW

Granted Hart 25/02448/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal and external alterations to the Stable Block and modifications to the wall to the east of the Stable Block

As published by the council, reference 25/02448/LBC

Application record

Reference
25/02448/LBC
Type
Listed Building Consent
Status
Grant
Decision
Grant
Received
2 Dec 2025
Validated
2 Dec 2025
Decided
6 Jul 2026
Ward
Hartley Wintney
Parish
Bramshill
Decision by
Delegated Decision
Postcode
RG27 0JW

Site history

Applications at this address on the Hart register

This site has had 21 applications since 2023: 18 approved, 0 refused.

  • 26/00469/LBC Awaiting decision

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Repair and restoration works to the walls surrounding Mansion Court (part retrospective)

    Submitted 19 Jun 2026 Heritage and listed buildings
  • 26/00832/CON Granted

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Details pursuant to condition 6 (stone floor record) of Planning Permission 23/02577/LBC Internal and external alterations to facilitate the conversion of Bramshill House to use as a single dwelling

    Decided 10 Jun 2026 Conditions
  • 26/00607/PREAPP Awaiting decision

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    The Phase 2 proposal includes the conversion and change of use of existing buildings within the Estate, supported by modest elements of new development predominantly on existing areas of hardstanding.

    Submitted 13 Apr 2026 Outline
  • 26/00542/LBC Granted

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Internal and external alterations to facilitate the conversion of Bramshill House to use as a single dwelling (alterations made to 23/02577/LBC)

    Decided 22 Jul 2026 Heritage and listed buildings
  • 26/00519/CON Granted

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Approval of Condition 25 - Modification following site discoveries - pursuant to 23/02577/LBC - Internal and external alterations to facilitate the conversion of Bramshill House to use as a single dwelling

    Decided 27 May 2026 Conditions
  • 26/00427/LBC Granted

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Repair works and alterations to the walls and gates surrounding Bramshill House

    Decided 6 Jul 2026 Heritage and listed buildings
  • 26/00383/CON Granted

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Discharge of condition no.15 - Investigation into cause of cracking pursuant to planning permission (23/02577/LBC) for the proposal of internal and external alterations to facilitate the conversion of Bramshill House to use as a single dwelling.

    Decided 25 Jun 2026 Conditions
  • 26/00310/GPDDEM Granted

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Application for prior approval for the demolition of seven buildings

    Decided 7 Apr 2026
  • 26/00156/CON Granted

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Approval of Condition 3 - Boundary treatment and Condition 4 - Emergency Evacuation Plan - pursuant to 23/01905/FUL - Change of use of Bramshill House, the Stable Block, Hazeley Lodges and surrounding land to use as a single dwelling (Use Class C3)

    Decided 25 Jun 2026 Conditions
  • 25/02449/CON Granted

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Details pursuant to conditions 5 (Stone floors - survey plan), 12 (Details of work to semi-circular opening), 20 (Repairs or works to rafters), 21 (New windows - statement of significance) of Planning Permission 23/02577/LBC Internal and external alterations to facilitate the conversion of Bramshill House to use as a single dwelling

    Decided 27 May 2026 Conditions

Timeline

Dates from the published record

  1. 2 Dec 2025

    Received by Hart

  2. 6 Jul 2026

    Decision issued: Grant

  3. 26 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Hart granted permission on 6 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    25/01306/LBC Submitted 9 Jul 2025 77m away

    External works including opening up a blocked window on the west elevation, reinstatement of ball finials; installation of blind glazing to bay and a French drain on the north elevation and replacing existing windows in the south west pavilion; lighting to façade centrepiece on the south elevation.

    Granted Heritage and listed buildings Windows or glazing 23 docs
  • Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    26/00427/LBC Submitted 13 Mar 2026 84m away

    Repair works and alterations to the walls and gates surrounding Bramshill House

    Granted Heritage and listed buildings 22 docs
  • Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    23/02572/GPDDEM Submitted 22 Nov 2023 91m away

    Application to determine if prior approval is required for a proposed demolition

    Granted Demolition 11 docs
  • Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    24/00117/TPO Submitted 15 Jan 2024 91m away

    Please refer to the Tree Schedule (Ref 240115-1.0-Bramshill House-TPO-App-Building Demo-MS) for details of each tree and tree group. Tree Refs: T18, T19, T20,T22, T25,T26,T27,T28, T180, T183, T184, T186, T187, T189, T219. Tree Group Refs: G21, G23, G57,G188. Two applications were recently submitted to Hart District Council (ref: 23/02572/GPDDEM and 23/02573/GPDDEM) for determination as to whether the prior approval of the authority was required for the demolition of 15 modern former police training college buildings at Bramshill Estate; Alder House, Beech Hall, Brambling ^a?? Glebe, Cope Hall, Dixon Hall, Elm House, E-Portal, Ice House Garages, Maple Hall, Oak Hall, Reception and Lecture Halls, Reprographics, Rowan Hall, Willow Hall and the Green Ride Bar. Prior approval was given for both applications on 21 December 2023. The removal of these buildings will facilitate the future restoration of the landscape within this central area of the Estate and details of the landscape proposals will be submitted as part of a future planning application. In order to demolish these buildings, a total of 14 no. individual trees and 5 no. tree groups are required to be removed as they are either attached to buildings or located within close proximity of the buildings. The trees proposed for removal are predominantly assessed as having a relatively low, current amenity value, are of young, semi mature and early mature life stage, some self seeded and of limited size. Not all trees may be covered by the TPO, although, for the purpose of this application, all are considered to potentially be protected. All of the trees to be removed have been assessed by an ecologist and none of the trees have bat roost potential.

    Granted Trees 4 docs
  • Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    25/02449/CON Submitted 2 Dec 2025 91m away

    Details pursuant to conditions 5 (Stone floors - survey plan), 12 (Details of work to semi-circular opening), 20 (Repairs or works to rafters), 21 (New windows - statement of significance) of Planning Permission 23/02577/LBC Internal and external alterations to facilitate the conversion of Bramshill House to use as a single dwelling

    Granted Conditions Windows or glazing 50 docs
    Domestic
  • Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    26/00156/CON Submitted 29 Jan 2026 91m away

    Approval of Condition 3 - Boundary treatment and Condition 4 - Emergency Evacuation Plan - pursuant to 23/01905/FUL - Change of use of Bramshill House, the Stable Block, Hazeley Lodges and surrounding land to use as a single dwelling (Use Class C3)

    Granted Conditions 16 docs
    Domestic

In Hart

  • 26/01387/LBC Awaiting decision

    3 The Courtyard London Road Hartford Bridge Hartley Wintney Hook Hampshire RG27 8AE

    Insertion of two rooflights following removal of dormer and two rooflights

    Heritage and listed buildings
  • 26/01556/LBC Awaiting decision

    The Cat Hook Road North Warnborough Hampshire RG29 1EU

    Installation of one electric vehicle charging point on front of garage

    Heritage and listed buildings
  • 26/01477/LBC Awaiting decision

    Chesters The Street Eversley Hampshire RG27 0PJ

    Works to facilitate the identification and treatment of dry rot fungus. Opening up works to identify extent of works required. Remedial works to the bathroom, windows and within the hall and landing.

    Heritage and listed buildings
  • 26/01487/LBC Awaiting decision

    Millfield Farmhouse Wellhouse Lane Bramshill Hook Hampshire RG27 0RJ

    Repair and refurbishment of the timber-framed building, including repairs to the timber frame and sole plate; construction of new foundations and rebuilding of the brick plinth; installation of a new insulated limecrete floor, breathable insulation and replacement oak weatherboarding; re-covering of the roof with clay tiles; replacement timber windows and doors; installation of timber shutters; and lime-plastered internal wall and ceiling finishes.

    Heritage and listed buildings
  • 26/00829/LBC Granted

    The Holt Holt Lane Hook Hampshire RG27 9EP

    Rebuild chimney stack after partial collapse, replacement roofing tile, new roof tile and timber rafter localised repairs.

    18 May 2026 Heritage and listed buildings