Skip to content
PlanIndex Get alerts
Menu

Planning application

25/01719/PREAPP

Sweetings Fir Drive Blackwater Camberley GU17 9BX

Decided Hart Pre-Application

Proposal

Replacement dwelling

As published by the council, reference 25/01719/PREAPP

Timeline

Dates from the published record

  1. 8 Sep 2025

    Received by Hart

  2. 15 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 11 Nov 2025

    Decision issued: Opinion Issued

  4. 26 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 25/01831/PREAPP Decided

    Connemara Fir Drive Blackwater Camberley GU17 9BX

    Two storey side extension and Replace existing garage with new garage

    23 Sep 2025 0m away Outline
  • 26/00169/FUL Granted

    Sweetings Fir Drive Blackwater Camberley Hampshire GU17 9BX

    Erection of a self/custom build dwelling and garage following demolition of the existing dwelling, garage and outbuilding (amended scheme).

    30 Jan 2026 41m away Full applications
  • 25/01198/FUL Refused

    Sweetings Fir Drive Blackwater Camberley Hampshire GU17 9BX

    Erection of replacement dwelling (Self and Custom Build) and detached double garage following demolition of existing house, detached single garage and outbuilding

    27 Jun 2025 41m away Full applications
  • 26/01012/HOU Awaiting decision

    Connemara Fir Drive Blackwater Camberley GU17 9BX

    Demolition of conservatory and erection of a two storey side extension and single storey rear extension, extension to garage, alterations to front entrance, extension to dropped kerb, installation of two dormer windows to the front roof slope and two velux windows to the rear roof slope

    17 Jun 2026 58m away Householder
  • 25/02198/PDTEL Decided

    Connemara Fir Drive Blackwater Camberley GU17 9BX

    Intention to install above-ground cabinet

    24 Oct 2025 69m away Telecoms
  • 26/00876/HOU Awaiting decision

    Chelwood Birch Drive Blackwater Camberley GU17 9BY

    Demolition of conservatory and erection of a single storey rear extension

    27 May 2026 113m away Householder

In Hart

  • 26/01115/PREAPP Decided

    Foxglove Cottage 7 Farnham Road Odiham Hook Hampshire RG29 1AA

    Erection of a detached timber garden office within the rear garden of a Grade II listed dwelling.

    3 Jul 2026 Outline
  • 26/01216/PREAPP Awaiting decision

    Rosemary Cottage Pankridge Street Crondall Farnham GU10 5QZ

    Proposed works include internal alterations to obtain an open plan layout, including a new compliant staircase, independent living room, rear kitchen/ dining living area. On the first floor, it is proposed to replace the existing two bedrooms for three bedrooms, family bathroom and en-suite. Externally, a 4m deep central extension, stepping down to 3.3m to the rest of the width, to host the open plan kitchen-living space. The existing rear dormer is replaced for two hipped twin roofs at first floor level. It is proposed to replace the uPVC windows with triple glazed timber casement windows incorporating a conservation-style central bar. Front oak frame open porch. Replacement of metal garage doors for timber barn style doors. Reduction of the side external level to achieve a minimum of 150mm between existing DPC and finished floor, and replacement of existing gas boiler for ASHP and solar panels located on the South-East facing roof.

    20 Jul 2026 Outline
  • 26/01213/PREAPP Awaiting decision

    17 The Cedars Fleet GU51 3YL

    Replacement front porch

    20 Jul 2026 Outline
  • 26/01201/OUT Awaiting decision

    Land At Murrell Green London Road Murrell Green Hook

    Outline application (with all matters reserved except access) for phased residential led mixed-use development comprising demolition of existing buildings/structures, provision of vehicular, cycle and pedestrian accesses (including details of 3no. accesses from the A30 London Road and 1no. access from the B3016 Odiham Road), development of up to 2,160 residential dwellings (including residential institution) (Use Class C2/C3), provision of employment, local centre and community uses (including education provision) (Use Classes E and F), blue and green infrastructure including sustainable drainage systems, public open space, sports pitches with pavilion, wildlife areas, Suitable Alternative Natural Green Space, and supporting infrastructure and associated works.

    16 Jul 2026 Outline
  • 26/00777/PREAPP Decided

    Laurel Cottage The Street North Warnborough Hook RG29 1BG

    Erection of ground floor rear extension, works to existing outrigger including part demolition, restoration of existing outbuilding to habitable standard, and landscaping to rear garden.

    7 May 2026 Outline