Skip to content
PlanIndex Get alerts
Menu

Planning application

The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

Granted Hart 21/02744/LBC Listed Building Consent

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to and extension of The Elvetham Hotel (to include the provision of 46 guest accommodation units) including: - Repair and restoration of chapel within Elvetham Hall - Demolition of 1970s extension to Elvetham Hall and erection of a single storey extension to accommodate new rooms - Partial demolition of existing extension and reinstatement of internal courtyard to Elvetham Hall - Various other minor internal and external alterations to Elvetham Hall - Demolition of underground air raid shelter - Erection of an events centre featuring basement, ground floor and mezzanine floor and a subterranean access from service wing - Demolition of glasshouses - Erection of new building attached to existing garden wall and small buildings for use as a spa - Renovation and conversion of St Mary's Church to provide function facility - Refurbishment of water tower to include installation of platform lift and conversion to guest accommodation units - Demolition of Bluebell Cottages and the erection of 2 two storey buildings to provide guest accommodation units - Demolition of Heather Cottages and the erection of 3 two storey buildings to provide guest accommodation units - Conversion of garden store and erection of a part single part two storey building to be known as Journeyman Cottages to provide guest accommodation units - Erection of refuse storage building - Erection of fuel tanks, generators - Replacement of one and creation of one sewerage treatment plant and associated utilities - Resurfacing, rearrangement and extension to car parking - Hard and soft landscaping works - Replacement entrance gates - Formation of gardener's yard - Lighting Scheme AMENDED PROPOSAL

As published by the council, reference 21/02744/LBC

Application record

Reference
21/02744/LBC
Type
Listed Building Consent
Status
Grant
Decision
Granted As published: Grant
Received
21 Oct 2021
Validated
13 Dec 2021
Decided
17 Aug 2022
Ward
Hartley Wintney
Parish
Hartley Wintney
Decision by
Committee Decision
Postcode
RG27 8AR

Site history

Applications at this address on the Hart register

This site has had 9 applications since 2021: 6 approved, 0 refused.

  • 25/00605/FUL Granted

    The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    Alterations to a section of boundary wall at St Mary's Church (part retrospective)

    Decided 29 Aug 2025 Full applications
  • 25/00606/LBC Granted

    The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    Alterations to a section of boundary wall at St Mary's Church (part retrospective)

    Decided 29 Aug 2025 Heritage and listed buildings
  • 25/00058/AMCON Granted

    The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    Variation of Condition 2 (plan numbers) attached to Listed Building Consent 24/00692/AMCON dated 12/06/2024 - Minor modifications to a Chimney at St Mary's Church (amended description).

    Decided 6 Jun 2025 Conditions
  • 24/01964/PREAPP Decided

    The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    Convert the vacant ground floor of the Water Tower and the ground floor office space to a Wellness Centre.

    Decided 9 Jun 2025 Outline
  • 21/02744/CON Granted

    The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    Approval of Condition 6- sampe of specification of finishes- and 12- details of repointing of exterior brickwork to the Hall- pursuant to 21/02744/LBC Alterations to and extension of The Elvetham Hotel (to include the provision of 46 guest accommodation units) including:- Repair and restoration of chapel within Elvetham Hall , - Demolition of 1970s extension to Elvetham Hall and erection of a single storey extension to accommodate new rooms , - Partial demolition of existing extension and reinstatement of internal courtyard to Elvetham Hall , - Various other minor internal and external alterations to Elvetham Hall , - Demolition of underground air raid shelter , - Erection of an events centre featuring basement, ground floor and mezzanine floor and a subterranean access from service wing , - Demolition of glasshouses , - Erection of new building attached to existing garden wall and small buildings for use as a spa , - Renovation and conversion of St Mary's Church to provide function facility , - Refurbishment of water tower to include installation of platform lift and conversion to guest accommodation units , - Demolition of Bluebell Cottages and the erection of 2 two storey buildings to provide guest accommodation units , - Demolition of Heather Cottages and the erection of 3 two storey buildings to provide guest accommodation units , - Conversion of garden store and erection of a part single part two storey building to be known as Journeyman Cottages to provide guest accommodation units , - Erection of refuse storage building , - Erection of fuel tanks, generators , - Replacement of one and creation of one sewerage treatment plant and associated utilities , - Resurfacing, rearrangement and extension to car parking , - Hard and soft landscaping works , - Replacement entrance gates , - Formation of gardener's yard, - Lighting Scheme AMENDED PROPOSAL

    Decided 6 Jun 2025 Conditions
  • 22/00760/FUL Awaiting decision

    The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    Internal and external works to The Stables and associated plant room

    Submitted 1 Apr 2022 Full applications
  • 22/00761/LBC Awaiting decision

    The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    Internal and external works to The Stables and associated plant room

    Submitted 1 Apr 2022 Heritage and listed buildings
  • 21/02743/FUL Granted

    The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    Alterations to and extension of The Elvetham Hotel (to include the provision of 46 guest accommodation units) including: - Repair and restoration of chapel within Elvetham Hall - Demolition of 1970s extension to Elvetham Hall and erection of a single storey extension to accommodate new rooms - Partial demolition of existing extension and reinstatement of internal courtyard to Elvetham Hall - Various other minor internal and external alterations to Elvetham Hall - Demolition of underground air raid shelter - Erection of an events centre featuring basement, ground floor and mezzanine floor and a subterranean access from service wing - Demolition of glasshouses - Erection of new building attached to existing garden wall and small buildings for use as a spa - Renovation and conversion of St Mary's Church to provide function facility - Refurbishment of water tower to include installation of platform lift and conversion to guest accommodation units - Demolition of Bluebell Cottages and the erection of 2 two storey buildings to provide guest accommodation units - Demolition of Heather Cottages and the erection of 3 two storey buildings to provide guest accommodation units - Conversion of garden store and erection of a part single part two storey building to be known as Journeyman Cottages to provide guest accommodation units - Erection of refuse storage building - Erection of fuel tanks, generators - Replacement of one and creation of one sewerage treatment plant and associated utilities - Resurfacing, rearrangement and extension to car parking - Hard and soft landscaping works - Replacement entrance gates - Formation of gardener's yard - Lighting Scheme AMENDED PROPOSAL

    Decided 17 Aug 2022 Full applications

Timeline

Dates from the published record

  1. 21 Oct 2021

    Received by Hart

  2. 13 Dec 2021

    Validated

    Checked as complete and ready for consideration.

  3. 17 Aug 2022

    Decision issued: Grant

  4. 19 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

606 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Hart granted permission on 17 August 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    21/02743/FUL Submitted 21 Oct 2021 50 yards away

    Alterations to and extension of The Elvetham Hotel (to include the provision of 46 guest accommodation units) including: - Repair and restoration of chapel within Elvetham Hall - Demolition of 1970s extension to Elvetham Hall and erection of a single storey extension to accommodate new rooms - Partial demolition of existing extension and reinstatement of internal courtyard to Elvetham Hall - Various other minor internal and external alterations to Elvetham Hall - Demolition of underground air raid shelter - Erection of an events centre featuring basement, ground floor and mezzanine floor and a subterranean access from service wing - Demolition of glasshouses - Erection of new building attached to existing garden wall and small buildings for use as a spa - Renovation and conversion of St Mary's Church to provide function facility - Refurbishment of water tower to include installation of platform lift and conversion to guest accommodation units - Demolition of Bluebell Cottages and the erection of 2 two storey buildings to provide guest accommodation units - Demolition of Heather Cottages and the erection of 3 two storey buildings to provide guest accommodation units - Conversion of garden store and erection of a part single part two storey building to be known as Journeyman Cottages to provide guest accommodation units - Erection of refuse storage building - Erection of fuel tanks, generators - Replacement of one and creation of one sewerage treatment plant and associated utilities - Resurfacing, rearrangement and extension to car parking - Hard and soft landscaping works - Replacement entrance gates - Formation of gardener's yard - Lighting Scheme AMENDED PROPOSAL

    Granted Full applications Extension Demolition 638 docs
    Small domestic
  • The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    22/00761/LBC Submitted 1 Apr 2022 50 yards away

    76% historically approved · decision due ~27 May

    Internal and external works to The Stables and associated plant room

    Awaiting decision Heritage and listed buildings 150 docs
  • The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    22/00760/FUL Submitted 1 Apr 2022 50 yards away

    84% historically approved · decision due ~27 May

    Internal and external works to The Stables and associated plant room

    Awaiting decision Full applications 165 docs
  • The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    25/00058/AMCON Submitted 13 Jan 2025 50 yards away

    Variation of Condition 2 (plan numbers) attached to Listed Building Consent 24/00692/AMCON dated 12/06/2024 - Minor modifications to a Chimney at St Mary's Church (amended description).

    Granted Conditions 20 docs
  • The Elvetham Hotel Fleet Road Hartley Wintney Hook RG27 8AR

    25/01706/PREAPP Submitted 8 Aug 2025 100 yards away

    Remedial works to the church spire

    Decided Outline 8 docs
  • The Elvetham Hotel Fleet Road Hartley Wintney Hook Hampshire RG27 8AR

    24/01964/PREAPP Submitted 27 Sep 2024 100 yards away

    Convert the vacant ground floor of the Water Tower and the ground floor office space to a Wellness Centre.

    Decided Outline 12 docs

In Hart

  • 26/01387/LBC Awaiting decision

    3 The Courtyard London Road Hartford Bridge Hartley Wintney Hook Hampshire RG27 8AE

    Insertion of two rooflights following removal of dormer and two rooflights

    Heritage and listed buildings
  • 26/01556/LBC Awaiting decision

    The Cat Hook Road North Warnborough Hampshire RG29 1EU

    Installation of one electric vehicle charging point on front of garage

    Heritage and listed buildings
  • 26/01477/LBC Awaiting decision

    Chesters The Street Eversley Hampshire RG27 0PJ

    Works to facilitate the identification and treatment of dry rot fungus. Opening up works to identify extent of works required. Remedial works to the bathroom, windows and within the hall and landing.

    Heritage and listed buildings
  • 26/01487/LBC Awaiting decision

    Millfield Farmhouse Wellhouse Lane Bramshill Hook Hampshire RG27 0RJ

    Repair and refurbishment of the timber-framed building, including repairs to the timber frame and sole plate; construction of new foundations and rebuilding of the brick plinth; installation of a new insulated limecrete floor, breathable insulation and replacement oak weatherboarding; re-covering of the roof with clay tiles; replacement timber windows and doors; installation of timber shutters; and lime-plastered internal wall and ceiling finishes.

    Heritage and listed buildings
  • 26/00829/LBC Granted

    The Holt Holt Lane Hook Hampshire RG27 9EP

    Rebuild chimney stack after partial collapse, replacement roofing tile, new roof tile and timber rafter localised repairs.

    Received 18 May, published by the council 26 Jul 2026 Heritage and listed buildings