Planning application
20/00785/PREAPP
Church Farm Church Road Eversley Hook Hampshire RG27 0PX
Proposal
Replacement dwelling
As published by the council, reference 20/00785/PREAPP
Timeline
Dates from the published record
-
30 Mar 2020
Received by Hart
-
2 Jul 2020
Decision issued: Opinion Issued
-
28 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
26/00323/PREAPP Decided
Eversley Burial Ground Church Road Eversley RG27 0PX
Change of use from agricultural land to cemetery, with footpaths, memorial garden, and planting.
-
25/01784/FUL Granted
Church Farm Church Road Eversley Hook Hampshire RG27 0PX
Erection of an agricultural barn and associated hard standing
-
26/00761/HOU Granted
Brick House Brickhouse Hill Eversley Hook Hampshire RG27 0PY
Erection of a covered wooden parking bay over the existing gravel parking area
Other outline applications
In Hart
-
26/01115/PREAPP Decided
Foxglove Cottage 7 Farnham Road Odiham Hook Hampshire RG29 1AA
Erection of a detached timber garden office within the rear garden of a Grade II listed dwelling.
-
26/01216/PREAPP Awaiting decision
Rosemary Cottage Pankridge Street Crondall Farnham GU10 5QZ
Proposed works include internal alterations to obtain an open plan layout, including a new compliant staircase, independent living room, rear kitchen/ dining living area. On the first floor, it is proposed to replace the existing two bedrooms for three bedrooms, family bathroom and en-suite. Externally, a 4m deep central extension, stepping down to 3.3m to the rest of the width, to host the open plan kitchen-living space. The existing rear dormer is replaced for two hipped twin roofs at first floor level. It is proposed to replace the uPVC windows with triple glazed timber casement windows incorporating a conservation-style central bar. Front oak frame open porch. Replacement of metal garage doors for timber barn style doors. Reduction of the side external level to achieve a minimum of 150mm between existing DPC and finished floor, and replacement of existing gas boiler for ASHP and solar panels located on the South-East facing roof.
-
26/01213/PREAPP Awaiting decision
17 The Cedars Fleet GU51 3YL
Replacement front porch
-
26/01201/OUT Awaiting decision
Land At Murrell Green London Road Murrell Green Hook
Outline application (with all matters reserved except access) for phased residential led mixed-use development comprising demolition of existing buildings/structures, provision of vehicular, cycle and pedestrian accesses (including details of 3no. accesses from the A30 London Road and 1no. access from the B3016 Odiham Road), development of up to 2,160 residential dwellings (including residential institution) (Use Class C2/C3), provision of employment, local centre and community uses (including education provision) (Use Classes E and F), blue and green infrastructure including sustainable drainage systems, public open space, sports pitches with pavilion, wildlife areas, Suitable Alternative Natural Green Space, and supporting infrastructure and associated works.
-
26/00777/PREAPP Decided
Laurel Cottage The Street North Warnborough Hook RG29 1BG
Erection of ground floor rear extension, works to existing outrigger including part demolition, restoration of existing outbuilding to habitable standard, and landscaping to rear garden.