Planning application
10 South Way, North Harrow, Harrow, HA2 6EP
Works: Loft or dormer Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Certificate of Lawful Proposed Development: Alterations to roof to form end gable and rear dormer with Juliette balcony, Installation of two roof lights in front roof slope and new window in end gable
As published by the council, reference PL/3212/25
Application record
- Reference
- PL/3212/25
- Type
- Certificate of Lawful Development Proposed
- Received
- 10 Dec 2025
- Ward
- North Harrow
- Postcode
- HA2 6EP
Timeline
Dates from the published record
-
10 Dec 2025
Received by Harrow
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Checking the current position
The process from here
The published feed does not show a live status for this application, which usually means the council register holds more recent detail than the copy PlanIndex receives.
The council portal linked on this page carries the authoritative version, including the documents, any consultation deadline and the decision once made. PlanIndex refreshes its copy of the register on a daily cycle.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
10 South Way, North Harrow, Harrow, HA2 6EP
Single and two storey rear extension; external alterations
Granted Householder ExtensionDomestic -
North Harrow Methodist Church, North Harrow Methodist Church Pinner Road, North Harrow, Harrow, HA2 6EQ
Electronic Communication Notification: Installation of 3No. cabinets, replacement of 1No meter cabinet; Replacement of existing 540mm shroud with 580mm shroud; ancillary works thereto.
Granted Telecoms -
North Harrow Methodist Church, North Harrow Methodist Church Pinner Road, North Harrow, Harrow, HA2 6EQ
Electronic Communications Development: Removal of 1 No. 15m Streetpole to be replaced with 20m Streetpole supporting 6 No. antennas; Ancillary works
Refused Telecoms -
North Harrow Methodist Church, Pinner Road, Harrow, HA2 6EQ
T1 sugar maple (rear of church): reduce to previous pruning points (up to 30% crown reduction)
Granted Trees 6 docs -
North Harrow Methodist Church, North Harrow Methodist Church Pinner Road, North Harrow, Harrow, HA2 6EQ
Electronic Communication Notification: Equipment changes within the existing cabinets with ancillary works thereto.
Granted Telecoms -
Methodist Church Streetworks, Pinner Road, Harrow, Ha2 6eq, North Harrow, HA2 6EQ
Electronic communications notification: Removal of existing 20m pole and installation of 20m high pole with 6 antennas; installation of 1 X equipment cabinet
Granted
Other lawful development applications
In Harrow
-
PL/1761/26 Status unknown
1 Middle Road, Harrow On The Hill, Harrow, HA2 0HW
Certificate of lawful development (proposed): Replacement of ground floor front bay window
-
PL/1772/26 Status unknown
114 Somervell Road, South Harrow, Harrow, HA2 8TT
Certificate of Lawful Proposed Development: Demolition and replacement of first floor level and roof
-
PL/1735/26 Status unknown
222 Malvern Avenue, South Harrow, Harrow, HA2 9HE
Certificate of lawful development (proposed): Rear dormer; installation of rooflight in front roofslope
-
PL/1716/26 Status unknown
59 Leamington Crescent, South Harrow, Harrow, HA2 9HH
Certificate of Lawful Development (Proposed): Garden room with garden tools storage at rear (demolition of detached garage)
-
PL/1696/26 Status unknown
31 Chandos Road, Harrow, HA1 4QX
Certificate of Lawful Development (Proposed): Alterations and extension to roof to form end gable; rear dormer; two rooflights in front roof slope; window in end gable