Skip to content
PlanIndex Get alerts
Menu

Planning application

529a Pinner Road, North Harrow, Harrow, HA2 6EH

Refused Harrow P/1200/21 Full Planning Application

Works: New dwelling Extension Loft or dormer

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Two storey rear extension to first and second floors to both flats; alterations to roof to form wrap around dormer to side and rear roofslopes to each flat; external staircase at rear

As published by the council, reference P/1200/21

Application record

Reference
P/1200/21
Type
Full Planning Application
Status
Final
Decision
Refused
Received
22 Mar 2021
Validated
12 May 2021
Decided
9 Jun 2021
Ward
Headstone North
Decision by
Delegated
Postcode
HA2 6EH

Timeline

Dates from the published record

  1. 22 Mar 2021

    Received by Harrow

  2. 12 May 2021

    Validated

    Checked as complete and ready for consideration.

  3. 9 Jun 2021

    Decision issued: Refused

  4. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Harrow

  • PL/1786/26 Status unknown

    23 Stuart Road, Wealdstone, Harrow, HA3 7RB

    Conversion of detached garage at rear to provide a single storey dwelling house ( 1 x 1 bed); Replace garage doors with door and window in front elevation; Replace door with window in side elevation; External alterations; Cycle and Refuse storage

    30 Jun 2026 Full applications
  • PL/1784/26 Status unknown

    14 Treve Avenue, West Harrow, Harrow, HA1 4AJ

    Conversion of existing 6-bed 6-person HMO into 7-bed 8-person HMO with associated bin and cycle storage

    30 Jun 2026 Full applications
  • PL/1777/26 Status unknown

    11 London Road, Harrow, HA1 3JJ

    Refurbishment and replacement of windows and door to the basement and ground floor front, side and rear elevations

    29 Jun 2026 Full applications
  • PL/1743/26 Status unknown

    49 Kings Way, Harrow, HA1 1XT

    Single and two storey side extension; external alterations: Conversion of dwellinghouse (C3) into a 6 person HMO (C4); refuse / cycle storage (demolition of attached garage)

    25 Jun 2026 Full applications
  • PL/1710/26 Status unknown

    4 Kenton Road, Kenton, Harrow, HA1 2BL

    Conversion of dwelling (C3) into house of multiple occupancy for up to 6 persons (Sui Generis)

    22 Jun 2026 Full applications