Proposal
Installation of a substation within a land plot of 3m x 3m located at Burley Hill
As published by the council, reference HW/TELD/24/00439
Application record
- Reference
- HW/TELD/24/00439
- Type
- Telecoms - Determination
- Status
- Pending Decision
- Decision
- Granted As published: Permission Not required
- Received
- 22 Nov 2024
- Validated
- 22 Nov 2024
- Decided
- 16 Dec 2024
- Ward
- Church Langley South
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
22 Nov 2024
Received by Harlow
-
16 Dec 2024
Decision issued: Permission Not required
-
30 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Fisher German LLP Agent
406 applications on PlanIndex · across 99 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Harlow granted permission on 16 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
1 Burley Hill Harlow Essex CM17 9QQ
91% historically approved · decision due ~19 Aug
Conversion of internal garage to office space
Awaiting decision -
26 Burley Hill Harlow Essex CM17 9QQ
Single storey side extension with a loft conversion and a rear dormer
Refused Householder Extension Loft or dormer 15 docsSmall domestic -
24 Burley Hill Harlow Essex CM17 9QQ
Use existing garage/storage area for additional living area
Granted Lawful development 6 docs -
13 Burley Hill Harlow Essex CM17 9QQ
Construction of a single storey rear extension
Granted Prior approval Extension 6 docsSmall domestic -
Substation North 26 Burley Hill Burley Hill Harlow Essex
Installation of a substation within a land plot of 3 m x 3 m located at Burley Hill
Decided Telecoms 1 doc -
Kitchen Hall Farm Red Lion Lane Harlow Essex CM17 9BU
Application for approval of details reserved by condition 2 (Granary Floor), condition 3 (Condition Survey & Schedule of Repair) and condition 5 (Additional Repair Works) of listed building consent HW/LBC/23/00110 for the conversion of existing curtilage listed ancillary barn into 2 no. semi-detached dwellings
Refused 7 docs
Other telecoms applications
In Harlow
-
HW/TEL/23/00242 Decided
Telecommunications Mast At EGT Radio Site Elizabeth Way Harlow Essex
Installation of 6 no. antenna, and ancillary development onto existing lattice mast. Installation of 1 no. replacement cabinet witin compound.
-
HW/TELD/24/00462 Granted
BT Mast WP3 Land West To Water Tower Old Hall Rise Harlow Essex
Erection of new, 9m light wooden telecommunications pole at land at Water Tower, Old Hall Rise GRID REF: 548609,209786 - WP3
-
HW/TELD/24/00271 Decided
Rye Hill Water Tower Rye Hill Road Harlow Essex
Installation of 18 no. antennae & 1 no. 0.3m dish. Existing equipment to be refreshed internally with other ancillary development.
-
HW/TELD/23/00481 Decided
Substation North 26 Burley Hill Burley Hill Harlow Essex
Installation of a substation within a land plot of 3 m x 3 m located at Burley Hill
-
HW/TELD/24/00417 Granted
Telecommunication Mast Opposite 24 Five Acres Partridge Road Harlow Essex
Replacement of existing 19m phase 8 telecommunications mast with new 20m phase 7 telecommunications mast, together with all associated ancillary works