Planning application
Unit 9 Temple House Estate 7 West Road Harlow Essex CM20 2DU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Sub-division of existing unit into 2 separate units
As published by the council, reference HW/FUL/24/00306
Application record
- Reference
- HW/FUL/24/00306
- Type
- Full Application
- Status
- Permitted
- Decision
- Granted Planning Permission
- Received
- 6 Aug 2024
- Validated
- 20 Aug 2024
- Decided
- 9 Oct 2024
- Ward
- Mark Hall North
- Decision by
- Delegated Decision
- Postcode
- CM20 2DU
Timeline
Dates from the published record
-
6 Aug 2024
Received by Harlow
-
20 Aug 2024
Validated
Checked as complete and ready for consideration.
-
9 Oct 2024
Decision issued: Granted Planning Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Brentwood
31 applications on PlanIndex · across 11 councils · 85% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Mansfield House West Road Harlow Essex CM20 2TZ
88% historically approved · decision due ~25 Sep
Change of use from Class E office furniture retail to residential comprising 10 flats (Ground Floor)
Awaiting decision New dwellingMajor scheme -
Land West Of West Point Business Park West Road Harlow Essex
Construction of micro energy storage facility
Granted Full applications 15 docs -
Pirelli Cables Optical Fibre Unit 3 West Road Harlow Essex CM202BT
Extend Existing Canopy and Transformer/Switchgear Compound
Granted Full applications -
Essanby Ltd. 3 West Road Harlow Essex CM202BT
Re-construction of North Side Elevation And New Entrance Lobby
Granted Full applications -
Astra Centre West Road Harlow Essex CM20 2BN
Erection of 3 storey office unit with undercroft parking and bin store
Refused Full applications 21 docs -
DC One Edinburgh Way Harlow Essex CM20 2BN
Installation of 1 no. non-illuminated fascia entrance sign above the proposed new shop front entrance and installation of 1 no. non-illuminated fascia company logo sign above.
Granted Advertising Windows or glazing 7 docs
Other full applications applications
In Harlow
-
HW/FUL/25/00504 Granted
Proposed Development South East Of Princess Alexandra Hospital Fourth Avenue Harlow Essex
Redevelopment of the site to provide mixed use development across 2 buildings, comprising purpose-built key worker accommodation (Sui Generis), residential units (Class C3) and commercial floorspace (Class E) at ground floor level, soft and hard landscaping, pedestrian and vehicular access, cycle parking and all other works associated with the development.
-
HW/FUL/26/00033 Granted
Adams House East Gate Harlow Essex
Refurbishment of the Adams House facades including replacement shopfronts (including signage), windows, the clock, changes to facing materials, and associated works
-
HW/FUL/26/00048 Granted
Burnt Mill Snooker And Social Club Edinburgh Way Harlow Essex CM20 2DQ
Removal of 16 no. car parking spaces and the creation of 12 no. EV car parking / larger vehicle spaces including charge points, fenced enclosure housing substation, with associated equipment, and external lighting (amended description)
-
HW/FUL/26/00205 Granted
Unit D Car Park Icon Harlow Third Avenue Harlow Essex CM19 5AW
Installation of plant and associated works to facilitate Electric Vehicle charging infrastructure
-
HW/FUL/26/00200 Granted
Gold Workshop 9 The Water Gardens South Gate Harlow Essex CM20 1AB
Installation of 2 no. traditional Victorian retractable awnings