Planning application
DC One Edinburgh Way Harlow Essex CM20 2BN
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of part of existing warehouse unit (Use Class B8) to retail use (Use Class A1) with the formation of new shop front.
As published by the council, reference HW/FUL/24/00276
Application record
- Reference
- HW/FUL/24/00276
- Type
- Full Application
- Status
- Pending Decision
- Decision
- Granted As published: Granted Planning Permission
- Received
- 15 Jul 2024
- Validated
- 15 Jul 2024
- Decided
- 16 Sep 2024
- Ward
- Mark Hall North
- Decision by
- Delegated Decision
- Postcode
- CM20 2BN
Site history
Applications at this address on the Harlow register
This site has had 2 applications since 2024: 2 approved, 0 refused.
-
HW/ADV/24/00277 Granted
DC One Edinburgh Way Harlow Essex CM20 2BN
Installation of 1 no. non-illuminated fascia entrance sign above the proposed new shop front entrance and installation of 1 no. non-illuminated fascia company logo sign above.
Timeline
Dates from the published record
-
15 Jul 2024
Received by Harlow
-
16 Sep 2024
Decision issued: Granted Planning Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Halliday West Ltd Agent, registered in Great Waltham
Active · incorporated 2001 · Great Waltham
23 applications on PlanIndex · across 5 councils · 85% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Harlow granted permission on 16 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
DC One Edinburgh Way Harlow Essex CM20 2BN
Installation of 1 no. non-illuminated fascia entrance sign above the proposed new shop front entrance and installation of 1 no. non-illuminated fascia company logo sign above.
Granted Advertising Windows or glazing 7 docs -
Astra Centre West Road Harlow Essex CM20 2BN
Erection of 3 storey office unit with undercroft parking and bin store
Refused Full applications 21 docs -
Pirelli Cables Optical Fibre Unit 3 West Road Harlow Essex CM202BT
Extend Existing Canopy and Transformer/Switchgear Compound
Granted Full applications -
Essanby Ltd. 3 West Road Harlow Essex CM202BT
Re-construction of North Side Elevation And New Entrance Lobby
Granted Full applications -
Unit 2 Harlow Retail Park Edinburgh Way Harlow Essex CM20 2TN
Four wall mounted entry board signs, three trolley bay signs, replacement panel to existing retail park estate totem, three new fascia signs on the front elevation (to replace two existing signs) and two replacement panels to existing high level box fascia signs on the side elevation
Granted Advertising 11 docs -
Unit 2 Harlow Retail Park Edinburgh Way Harlow Essex CM20 2TN
Installation of New Sliding Doors between Garden Centre and Main Store Building and New Means of Escape Door and Roller Shutter Door on the Rear Elevation of the Main Store Building
Granted Full applications 12 docs
Other full applications
In Harlow
-
HW/FUL/26/00357 Status unknown
Harlowbury Primary School Watlington Road Harlow Essex CM17 0DX
Demolition of existing buildings and redevelopment to provide 10 dwellings, incorporating parking, landscaping, and associated infrastructure
-
HW/FUL/26/00342 Status unknown
1 Burnt Mill Harlow Essex CM20 2UP
Installation of new aluminium automatic single sliding door with new shopfront glazing and frames
-
HW/FUL/26/00337 Status unknown
Green Hills Common Room Green Hills Harlow Essex CM20 3SZ
Change the use of the existing building & conversion into a temporary housing unit
-
HW/FUL/25/00343 Granted
Cavendish House Parkway Harlow Essex CM19 5QF
Construction of a double storey side and rear extension to the existing building
-
HW/FUL/26/00121 Granted
Staple Tye Petrol Service Station Southern Way Harlow Essex CM18 7NN
Removal of existing car wash and relocation of existing EV Charger. Installation of 2 additional EV Chargers with associated bollards and lighting. Formation of 6 new EV bays, including 1 EV accessible bay. Removal of existing LV Feeder Pillar and installation of new LV Feeder Pillar with timber enclosure. Relocation of Air & Vac equipment.