Planning application
Esso Service Station Kitson Way Harlow Essex CM20 1DR
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing jet wash machine and car wash and the creation of charging zone, erection of EV chargers, erection of canopy, two jet wash bays, sub-station enclosure and associated forecourt works.
As published by the council, reference HW/FUL/22/00527
Application record
- Reference
- HW/FUL/22/00527
- Type
- Full Application
- Status
- Pending Decision
- Decision
- Granted Planning Permission
- Received
- 25 Nov 2022
- Validated
- 28 Nov 2022
- Decided
- 20 Jan 2023
- Ward
- Toddbrook
- Decision by
- Delegated Decision
- Postcode
- CM20 1DR
Timeline
Dates from the published record
-
25 Nov 2022
Received by Harlow
-
28 Nov 2022
Validated
Checked as complete and ready for consideration.
-
20 Jan 2023
Decision issued: Granted Planning Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Farnham
430 applications on PlanIndex · across 90 councils · 96% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Linkway Service Station Kitson Way Harlow Essex CM20 1DR
84% historically approved · decision due ~18 Nov
Creation of charging zone, erection of EV chargers, sub-station enclosure, LV panel, meter cabinet and associated forecourt works
Awaiting decision Full applications 32 docs -
Esso Service Station Kitson Way Harlow Essex CM20 1DR
88% historically approved · decision due ~17 Aug
Installation of internally illuminated 7-meter EV totem sign
Awaiting decision -
Proposed Temporary Pharmacy Hamstel Road Harlow Essex
Provision of temporary portakabin (for a period of 24 months) for use as replacement pharmacy (Use Class A1) and/or Marketing Suite associated with the redevelopment of Wych Elm House (LPA Ref: HW/FUL/19/00241)
Granted Full applications 8 docs -
1 Mitre Buildings Kitson Way Harlow Essex CM20 1DR
External alterations creating openings for new windows and one door
Granted Full applications Windows or glazing 12 docs -
North Of Aylmer House Kitson Way Harlow Essex
Erection of residential building ranging between 7 and 9 storeys to provide 49 flats (26 x 1 bed, 21 x 2 bed and 2 x 3 bed) with associated parking, amenity areas and other associated works.
Granted Full applications New dwelling 54 docsMajor scheme -
North Of Aylmer House Kitson Way Harlow Essex
Erection of a part 6, part 12 storey building to provide 56 no. flats with roof terrace, ground floor commercial and associated works (revised scheme following previous approval ref - HW/FUL/20/00161)
Granted Full applications New dwelling 88 docsMajor scheme
Other full applications applications
In Harlow
-
HW/FUL/25/00504 Granted
Proposed Development South East Of Princess Alexandra Hospital Fourth Avenue Harlow Essex
Redevelopment of the site to provide mixed use development across 2 buildings, comprising purpose-built key worker accommodation (Sui Generis), residential units (Class C3) and commercial floorspace (Class E) at ground floor level, soft and hard landscaping, pedestrian and vehicular access, cycle parking and all other works associated with the development.
-
HW/FUL/26/00033 Granted
Adams House East Gate Harlow Essex
Refurbishment of the Adams House facades including replacement shopfronts (including signage), windows, the clock, changes to facing materials, and associated works
-
HW/FUL/26/00048 Granted
Burnt Mill Snooker And Social Club Edinburgh Way Harlow Essex CM20 2DQ
Removal of 16 no. car parking spaces and the creation of 12 no. EV car parking / larger vehicle spaces including charge points, fenced enclosure housing substation, with associated equipment, and external lighting (amended description)
-
HW/FUL/26/00205 Granted
Unit D Car Park Icon Harlow Third Avenue Harlow Essex CM19 5AW
Installation of plant and associated works to facilitate Electric Vehicle charging infrastructure
-
HW/FUL/26/00200 Granted
Gold Workshop 9 The Water Gardens South Gate Harlow Essex CM20 1AB
Installation of 2 no. traditional Victorian retractable awnings