Planning application
314 - 322 Halling Hill Harlow Essex
Works: Roofing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of failed timber lining to gable panels and facias of bungalows with textured and coloured tongue & groove cement fibre board linings, replacement of existing bituminous flat roof coverings with new bituminous covering and replacement of polycarbonate roof covering with twin wall polycarbonate roof sheeting.
As published by the council, reference HW/FUL/22/00501
Application record
- Reference
- HW/FUL/22/00501
- Type
- Full Application
- Status
- Pending Decision
- Decision
- Granted As published: Granted Planning Permission
- Received
- 8 Nov 2022
- Validated
- 7 Dec 2022
- Decided
- 2 Feb 2023
- Ward
- Netteswell
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
8 Nov 2022
Received by Harlow
-
7 Dec 2022
Validated
Checked as complete and ready for consideration.
-
2 Feb 2023
Decision issued: Granted Planning Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
John Burke Associates Agent
17 applications on PlanIndex · across 3 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Harlow granted permission on 2 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
11 Commonfields Harlow Essex CM20 3QE
Two-storey and single storey rear extension
Granted Householder Extension 7 docsSmall domestic -
309A Halling Hill Harlow Essex CM20 3JU
91% historically approved · decision due ~29 Oct
Change the use of the existing building and conversion into a self-contained 1-bedroom flat
Awaiting decision -
292 Halling Hill Harlow Essex CM20 3JU
91% historically approved · decision due ~11 Dec
Proposed front access vehicular hardstand
Awaiting decision -
289 Halling Hill Harlow Essex CM20 3JU
Single storey rear extension
Granted Lawful development Extension 5 docsSmall domestic -
Proposed Window Replacement At 19-24 Halling Hill Harlow Essex
Replacement of single glazed timber and plastic windows for double glazed units to match existing profiles.
Granted Full applications Windows or glazing 5 docs -
194 Pittmans Field Harlow Essex CM20 3LG
Removal of existing rear extension and construction of new single storey side and rear extension
Granted Householder Extension 7 docsSmall domestic
Other full applications
In Harlow
-
HW/FUL/26/00357 Status unknown
Harlowbury Primary School Watlington Road Harlow Essex CM17 0DX
Demolition of existing buildings and redevelopment to provide 10 dwellings, incorporating parking, landscaping, and associated infrastructure
-
HW/FUL/26/00342 Status unknown
1 Burnt Mill Harlow Essex CM20 2UP
Installation of new aluminium automatic single sliding door with new shopfront glazing and frames
-
HW/FUL/26/00337 Status unknown
Green Hills Common Room Green Hills Harlow Essex CM20 3SZ
Change the use of the existing building & conversion into a temporary housing unit
-
HW/FUL/25/00343 Granted
Cavendish House Parkway Harlow Essex CM19 5QF
Construction of a double storey side and rear extension to the existing building
-
HW/FUL/26/00121 Granted
Staple Tye Petrol Service Station Southern Way Harlow Essex CM18 7NN
Removal of existing car wash and relocation of existing EV Charger. Installation of 2 additional EV Chargers with associated bollards and lighting. Formation of 6 new EV bays, including 1 EV accessible bay. Removal of existing LV Feeder Pillar and installation of new LV Feeder Pillar with timber enclosure. Relocation of Air & Vac equipment.