Planning application
Flat Block 108-113 Hull Grove Harlow Essex
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of all timber and plastic framed windows for plastic framed double glazed units to match existing profiles. Replacement of single glazed timber framed communal front and rear entrance doors including communal glazed screens with white plastic or aluminium powder coated frames.
As published by the council, reference HW/FUL/21/00404
Application record
- Reference
- HW/FUL/21/00404
- Type
- Full Application
- Status
- Pending Decision
- Decision
- Granted As published: Granted Planning Permission
- Received
- 9 Jul 2021
- Validated
- 9 Jul 2021
- Decided
- 27 Aug 2021
- Ward
- Sumners And Kingsmoor
- Decision by
- Delegated Decision
- Postcode
- CM19 5RR
Timeline
Dates from the published record
-
9 Jul 2021
Received by Harlow
-
27 Aug 2021
Decision issued: Granted Planning Permission
-
19 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
First Prospect Limited Agent, registered in Maldon
Active · incorporated 2006 · Maldon
29 applications on PlanIndex · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Harlow granted permission on 27 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
-
45 Sumners Farm Close Harlow Essex CM19 5SL
Replacement of existing timber weatherboard with lime render.
Decided Full applications 5 docs -
45 Sumners Farm Close Harlow Essex CM19 5SL
Replacement of existing timber weatherboard with lime render.
Decided Heritage and listed buildings 5 docs -
-
45 Sumners Farm Close Harlow Essex CM19 5SL
Window replacement works. Prior approval received under LPA reference; HW/LBC/25/00086 and HW/FUL/25/00009. Requires clarification to suit the adjoining hallway passage which links the supported housing building to the listed building.
Granted Heritage and listed buildings Windows or glazing 14 docs -
The Pine Barn 2 Barns Court Sumners Farm Close Harlow Essex CM19 5QT
Tl - Horse Chestnut. Monolith to a height of 3.5 meters. To alleviate the stress at the base of the tree and encourage new growth to form a new crown
Refused Trees 5 docs
Other full applications
In Harlow
-
HW/FUL/26/00357 Status unknown
Harlowbury Primary School Watlington Road Harlow Essex CM17 0DX
Demolition of existing buildings and redevelopment to provide 10 dwellings, incorporating parking, landscaping, and associated infrastructure
-
HW/FUL/26/00342 Status unknown
1 Burnt Mill Harlow Essex CM20 2UP
Installation of new aluminium automatic single sliding door with new shopfront glazing and frames
-
HW/FUL/26/00337 Status unknown
Green Hills Common Room Green Hills Harlow Essex CM20 3SZ
Change the use of the existing building & conversion into a temporary housing unit
-
HW/FUL/25/00343 Granted
Cavendish House Parkway Harlow Essex CM19 5QF
Construction of a double storey side and rear extension to the existing building
-
HW/FUL/26/00121 Granted
Staple Tye Petrol Service Station Southern Way Harlow Essex CM18 7NN
Removal of existing car wash and relocation of existing EV Charger. Installation of 2 additional EV Chargers with associated bollards and lighting. Formation of 6 new EV bays, including 1 EV accessible bay. Removal of existing LV Feeder Pillar and installation of new LV Feeder Pillar with timber enclosure. Relocation of Air & Vac equipment.