Planning application
Flat Block 190-195 Jerounds Harlow Essex
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of single glazed and dated double glazed plastic framed windows for uPVC double glazed units to match existing profiles. Replacement front path and handrail. Extended communal electrical intake cupboard to enable electrical installation upgrade.
As published by the council, reference HW/FUL/21/00248
Application record
- Reference
- HW/FUL/21/00248
- Type
- Full Application
- Status
- Pending Decision
- Decision
- Granted As published: Granted Planning Permission
- Received
- 30 Apr 2021
- Validated
- 30 Apr 2021
- Decided
- 18 Jun 2021
- Ward
- Great Parndon
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
30 Apr 2021
Received by Harlow
-
18 Jun 2021
Decision issued: Granted Planning Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
First Prospect Limited Agent, registered in Maldon
Active · incorporated 2006 · Maldon
29 applications on PlanIndex · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Harlow granted permission on 18 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
174 Jerounds Harlow Essex CM19 4HH
Construction of a two-storey front extension
Refused Householder Extension 18 docsDomestic -
Jerounds Primary School Pyenest Road Harlow Essex CM19 4PH
Replacement of amenity grass area with permeable astroturf, to allow the area to be used through the year as an all-weather surface.
Withdrawn Full applications 6 docs -
Flat Block 236-240 Hollyfield Harlow Essex
External Works including: Replacement of existing gutters. New roof coverings. Replacement of existing windows. Replacement of existing front entrance doors. New powder coated balustrade with infill panels.
Granted Full applications Extension Roofing +1 8 docs -
Domestic
-
Sherards House Three Horseshoes Road Harlow Essex
Proposed demolition
Granted Other Demolition 6 docs -
21 Cock Green Harlow Essex CM19 4JB
Erection of a two bed, wooden framed free standing annex
Granted Householder 7 docsDomestic
Other full applications
In Harlow
-
HW/FUL/26/00357 Status unknown
Harlowbury Primary School Watlington Road Harlow Essex CM17 0DX
Demolition of existing buildings and redevelopment to provide 10 dwellings, incorporating parking, landscaping, and associated infrastructure
-
HW/FUL/26/00342 Status unknown
1 Burnt Mill Harlow Essex CM20 2UP
Installation of new aluminium automatic single sliding door with new shopfront glazing and frames
-
HW/FUL/26/00337 Status unknown
Green Hills Common Room Green Hills Harlow Essex CM20 3SZ
Change the use of the existing building & conversion into a temporary housing unit
-
HW/FUL/25/00343 Granted
Cavendish House Parkway Harlow Essex CM19 5QF
Construction of a double storey side and rear extension to the existing building
-
HW/FUL/26/00121 Granted
Staple Tye Petrol Service Station Southern Way Harlow Essex CM18 7NN
Removal of existing car wash and relocation of existing EV Charger. Installation of 2 additional EV Chargers with associated bollards and lighting. Formation of 6 new EV bays, including 1 EV accessible bay. Removal of existing LV Feeder Pillar and installation of new LV Feeder Pillar with timber enclosure. Relocation of Air & Vac equipment.