Planning application
Moor Tower Waterhouse Moor Harlow Essex
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of existing UPVC windows on each level as part of fire safety works
As published by the council, reference HW/FUL/21/00173
Application record
- Reference
- HW/FUL/21/00173
- Type
- Full Application
- Status
- Permitted
- Decision
- Granted Planning Permission
- Received
- 26 Mar 2021
- Validated
- 26 Mar 2021
- Decided
- 21 May 2021
- Ward
- Bush Fair
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
26 Mar 2021
Received by Harlow
-
21 May 2021
Decision issued: Granted Planning Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
13 applications on PlanIndex · across 3 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
65 Waterhouse Moor Harlow Essex CM186BD
Two Storey Rear Extension
Granted Full applications Extension -
55 Waterhouse Moor Harlow Essex CM18 6BD
Construction of a single storey rear extension, alteration to existing windows and external and internal alterations
Granted Householder Extension Windows or glazing 11 docsSmall domestic -
26 St Andrews Meadow Harlow Essex CM18 6BL
Construction of a rear dormer
Granted Householder Loft or dormer 10 docsDomestic -
26 St Andrews Meadow Harlow Essex CM18 6BL
Velux conversion
Granted Householder Loft or dormer 10 docsDomestic -
Redevelopment Of Elm Hatch Elm Hatch Harlow Essex CM18 6BH
88% historically approved · decision due ~30 Jul
Application for approval of details reserved by condition 19 (Residential Travel Information Pack) & condition 22 (Landscaping Detailed Method Statement) of planning permission HW/FUL/23/00331 for erection of 6 no. new C3 apartments, two new Class E1 retail units and 1 no. wheelchair accessible family house, with associated new hard and soft landscape and parking
Awaiting decision New dwelling 5 docs -
Redevelopment Of Elm Hatch Elm Hatch Harlow Essex CM18 6BH
88% historically approved · decision due ~5 Aug
Application for non-material amendment following a grant of planning permission under planning reference HW/FUL/23/00331 for additional gated access to rear garden directly from parking space to a ramped access within garden
Awaiting decision
Other full applications applications
In Harlow
-
HW/FUL/25/00504 Granted
Proposed Development South East Of Princess Alexandra Hospital Fourth Avenue Harlow Essex
Redevelopment of the site to provide mixed use development across 2 buildings, comprising purpose-built key worker accommodation (Sui Generis), residential units (Class C3) and commercial floorspace (Class E) at ground floor level, soft and hard landscaping, pedestrian and vehicular access, cycle parking and all other works associated with the development.
-
HW/FUL/26/00033 Granted
Adams House East Gate Harlow Essex
Refurbishment of the Adams House facades including replacement shopfronts (including signage), windows, the clock, changes to facing materials, and associated works
-
HW/FUL/26/00048 Granted
Burnt Mill Snooker And Social Club Edinburgh Way Harlow Essex CM20 2DQ
Removal of 16 no. car parking spaces and the creation of 12 no. EV car parking / larger vehicle spaces including charge points, fenced enclosure housing substation, with associated equipment, and external lighting (amended description)
-
HW/FUL/26/00205 Granted
Unit D Car Park Icon Harlow Third Avenue Harlow Essex CM19 5AW
Installation of plant and associated works to facilitate Electric Vehicle charging infrastructure
-
HW/FUL/26/00200 Granted
Gold Workshop 9 The Water Gardens South Gate Harlow Essex CM20 1AB
Installation of 2 no. traditional Victorian retractable awnings