Skip to content
PlanIndex Get alerts
Menu

Planning application

Proposed Window Replacement At 122-127 Halling Hill Harlow Essex

Granted Harlow HW/FUL/20/00277 Full Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of single glazed timber and plastic windows for double glazed units to match existing profiles.

As published by the council, reference HW/FUL/20/00277

Application record

Reference
HW/FUL/20/00277
Type
Full Application
Status
Permitted
Decision
Granted Planning Permission
Received
19 Jun 2020
Validated
15 Jul 2020
Decided
4 Sep 2020
Ward
Netteswell
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 19 Jun 2020

    Received by Harlow

  2. 15 Jul 2020

    Validated

    Checked as complete and ready for consideration.

  3. 4 Sep 2020

    Decision issued: Granted Planning Permission

  4. 9 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Maldon

27 applications on PlanIndex · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Proposed Window Replacement At 35-40 Halling Hill Harlow Essex

    HW/FUL/20/00274 Submitted 19 Jun 2020 38m away

    Replacement of single glazed timber and plastic windows for double glazed units to match existing profiles.

    Granted Full applications Windows or glazing 5 docs
  • Flat Block 112-117 Halling Hill Harlow Essex

    HW/FUL/20/00276 Submitted 19 Jun 2020 56m away

    Replacement of single glazed timber and plastic windows for double glazed units to match existing profiles.

    Granted Full applications Windows or glazing 5 docs
  • Flat Block 43-48 Halling Hill Harlow Essex

    HW/FUL/20/00275 Submitted 19 Jun 2020 76m away

    Replacement of single glazed timber and plastic windows for double glazed units to match existing profiles.

    Granted Full applications Windows or glazing 5 docs
  • 163 Halling Hill Harlow Essex CM20 3JP

    HW/LDCP/21/00315 Submitted 1 Jun 2021 97m away

    Front Porch

    Decided Lawful development Extension 5 docs
    Small domestic
  • Aldi Foodstore Ltd First Avenue Harlow Essex CM20 3FA

    HW/FUL/24/00404 Submitted 30 Oct 2024 105m away

    Removal of existing plant equipment and its replacement with new plant equipment within internal plant area, as well as the installation of externally located air source heat pumps and the erection of associated security fencing.

    Granted Full applications 14 docs
  • The Service Bays The Stow Harlow Essex

    HW/REMVAR/26/00191 Submitted 8 May 2026 115m away

    88% historically approved · decision due ~3 Jul

    Application for variation of condition 18 (Use of commercial space) of planning permission HW/REMVAR/25/00049 for variation of condition 27 (Approved Plans) of planning permission HW/FUL/22/00226 for the Re-development of former service industry bays into a mixed-use development.

    Awaiting decision Amendments 5 docs

In Harlow

  • HW/FUL/25/00504 Granted

    Proposed Development South East Of Princess Alexandra Hospital Fourth Avenue Harlow Essex

    Redevelopment of the site to provide mixed use development across 2 buildings, comprising purpose-built key worker accommodation (Sui Generis), residential units (Class C3) and commercial floorspace (Class E) at ground floor level, soft and hard landscaping, pedestrian and vehicular access, cycle parking and all other works associated with the development.

    8 Dec 2025 Full applications
  • HW/FUL/26/00033 Granted

    Adams House East Gate Harlow Essex

    Refurbishment of the Adams House facades including replacement shopfronts (including signage), windows, the clock, changes to facing materials, and associated works

    29 Jan 2026 Full applications
  • HW/FUL/26/00048 Granted

    Burnt Mill Snooker And Social Club Edinburgh Way Harlow Essex CM20 2DQ

    Removal of 16 no. car parking spaces and the creation of 12 no. EV car parking / larger vehicle spaces including charge points, fenced enclosure housing substation, with associated equipment, and external lighting (amended description)

    10 Feb 2026 Full applications
  • HW/FUL/26/00205 Granted

    Unit D Car Park Icon Harlow Third Avenue Harlow Essex CM19 5AW

    Installation of plant and associated works to facilitate Electric Vehicle charging infrastructure

    20 May 2026 Full applications
  • HW/FUL/26/00200 Granted

    Gold Workshop 9 The Water Gardens South Gate Harlow Essex CM20 1AB

    Installation of 2 no. traditional Victorian retractable awnings

    18 May 2026 Full applications