Planning application
Proposed Works For 1-15 Altham Grove Harlow Essex
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of existing damaged roof to 1-15 Altham Grove
As published by the council, reference HW/FUL/20/00039
Application record
- Reference
- HW/FUL/20/00039
- Type
- Full Application
- Status
- Pending Decision
- Decision
- Granted As published: Granted Planning Permission
- Received
- 27 Jan 2020
- Validated
- 14 Feb 2020
- Decided
- 12 Jun 2020
- Ward
- Netteswell
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
27 Jan 2020
Received by Harlow
-
14 Feb 2020
Validated
Checked as complete and ready for consideration.
-
12 Jun 2020
Decision issued: Granted Planning Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
AK Design Partnership LLP Agent, a design practice
22 applications on PlanIndex · across 7 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Harlow granted permission on 12 June 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
97 Altham Grove Harlow Essex CM20 2PJ
Change of Use From Single Residential Dwelling to Residential Hostel
Granted Full applicationsDomestic -
17 Great Plumtree Harlow Essex CM20 2NT
Erection of 1 no. dwellinghouse with side extension
Withdrawn Full applications Extension 25 docsDomestic -
101 Altham Grove Harlow Essex CM20 2PJ
Proposed porch infill extension with canopy roof alongside rear and side two-storey infill extension including skylight, bi-fold door & juliet balcony
Granted Householder Extension Windows or glazing 7 docsSmall domestic -
103 Altham Grove Harlow Essex CM20 2PJ
Construction of a single storey extension above existing side extension and front porch.
Granted Householder Extension 6 docsSmall domestic -
5 Glebelands Harlow Essex CM20 2PA
Retrospective permission for rendering of front, rear & side external walls to protect building
Refused Householder 12 docsDomestic -
Proposed Window Replacement At 109-112 Altham Grove Harlow Essex
Replacement of single glazed timber and plastic windows for double glazed units to match existing profiles.
Granted Full applications Windows or glazing 6 docs
Other full applications
In Harlow
-
HW/FUL/26/00357 Status unknown
Harlowbury Primary School Watlington Road Harlow Essex CM17 0DX
Demolition of existing buildings and redevelopment to provide 10 dwellings, incorporating parking, landscaping, and associated infrastructure
-
HW/FUL/26/00342 Status unknown
1 Burnt Mill Harlow Essex CM20 2UP
Installation of new aluminium automatic single sliding door with new shopfront glazing and frames
-
HW/FUL/26/00337 Status unknown
Green Hills Common Room Green Hills Harlow Essex CM20 3SZ
Change the use of the existing building & conversion into a temporary housing unit
-
HW/FUL/25/00343 Granted
Cavendish House Parkway Harlow Essex CM19 5QF
Construction of a double storey side and rear extension to the existing building
-
HW/FUL/26/00121 Granted
Staple Tye Petrol Service Station Southern Way Harlow Essex CM18 7NN
Removal of existing car wash and relocation of existing EV Charger. Installation of 2 additional EV Chargers with associated bollards and lighting. Formation of 6 new EV bays, including 1 EV accessible bay. Removal of existing LV Feeder Pillar and installation of new LV Feeder Pillar with timber enclosure. Relocation of Air & Vac equipment.