Planning application
Clock House Latton Street Harlow Essex CM20 3SD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Repairing and reinstatement of masonry, timber work, rwp downpipes also works to bell tower to provide waterproofing of flat roof area above clock housing.
As published by the council, reference HW/FUL/20/00007
Application record
- Reference
- HW/FUL/20/00007
- Type
- Full Application
- Status
- Permitted
- Decision
- Granted Planning Permission
- Received
- 7 Jan 2020
- Validated
- 28 Jan 2020
- Decided
- 20 Mar 2020
- Ward
- Mark Hall
- Decision by
- Delegated Decision
- Postcode
- CM20 3SD
Timeline
Dates from the published record
-
7 Jan 2020
Received by Harlow
-
28 Jan 2020
Validated
Checked as complete and ready for consideration.
-
20 Mar 2020
Decision issued: Granted Planning Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
27 applications on PlanIndex · across 15 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Clock House Latton Street Harlow Essex CM20 3SD
Repairing and reinstatement of masonry, timber work, rwp downpipes also works to bell tower to provide waterproofing of flat roof area above clock housing.
Granted Heritage and listed buildings 10 docs -
1 Puffers Green Cottages Latton Street Harlow Essex CM20 3SD
1 x Oak - Remove Dead Branch and Clean Crown, Visual Health Inspection. 1x Ash and 2 x Oaks - Clean Crowns, Visual Health Inspection.
Granted Trees 7 docs -
-
Advertisement Board At Second Avenue/Clocktower Roundabout Second Avenue Harlow Essex CM17 9QU
Erection of 4 no. sponsorship signs to be placed on the Second Avenue/Clocktower Roundabout
Granted Advertising 10 docs -
33 The Gardiners Harlow Essex CM17 9QU
Demolition of the existing conservatory and replaced with a single storey rear extension
Decided Lawful development Extension Demolition 7 docsSmall domestic -
7 The Gardiners Harlow Essex CM17 9QU
Two-storey side extension
Granted Householder Extension 8 docsDomestic
Other full applications applications
In Harlow
-
HW/FUL/25/00504 Granted
Proposed Development South East Of Princess Alexandra Hospital Fourth Avenue Harlow Essex
Redevelopment of the site to provide mixed use development across 2 buildings, comprising purpose-built key worker accommodation (Sui Generis), residential units (Class C3) and commercial floorspace (Class E) at ground floor level, soft and hard landscaping, pedestrian and vehicular access, cycle parking and all other works associated with the development.
-
HW/FUL/26/00033 Granted
Adams House East Gate Harlow Essex
Refurbishment of the Adams House facades including replacement shopfronts (including signage), windows, the clock, changes to facing materials, and associated works
-
HW/FUL/26/00048 Granted
Burnt Mill Snooker And Social Club Edinburgh Way Harlow Essex CM20 2DQ
Removal of 16 no. car parking spaces and the creation of 12 no. EV car parking / larger vehicle spaces including charge points, fenced enclosure housing substation, with associated equipment, and external lighting (amended description)
-
HW/FUL/26/00205 Granted
Unit D Car Park Icon Harlow Third Avenue Harlow Essex CM19 5AW
Installation of plant and associated works to facilitate Electric Vehicle charging infrastructure
-
HW/FUL/26/00200 Granted
Gold Workshop 9 The Water Gardens South Gate Harlow Essex CM20 1AB
Installation of 2 no. traditional Victorian retractable awnings