Planning application
228 High Road, Wood Green, London, N22 8HH
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Replacement of the ground floor commercial unit’s shopfront, security shutter, and extremal canopy following fire damage.
As published by the council, reference HGY/2026/2139
Application record
- Reference
- HGY/2026/2139
- Type
- Full planning permission
- Status
- Under Consultation
- Received
- 27 Jul 2026
- Validated
- 27 Jul 2026
- Ward
- Woodside
- Decision by
- Delegated Decision
- Postcode
- N22 8HH
Timeline
Dates from the published record
-
27 Jul 2026
Received by Haringey
-
10 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Haringey took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Haringey for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Wood Green Underground Station, High Road, London, N22 8HH
Approval of details reserved by a condition 3 (site investigation with schedule of works and method statement) in relation to Listed Building Consent HGY/2022/0460
Granted Conditions 7 docs -
Wood Green Underground Station, High Road, London, N22 8HH
Listed Building Consent to raise platform levels to enable step-free access between trains and platform, new seating, and associated changes.
Granted Heritage and listed buildings 16 docs -
Workshop Rear Of, 228-230, High Road, London, N22 8HH
Fascia advertisement sign above workshop
Granted Advertising 27 docs -
Cannon Factory and Ashley House, Ashley Road, London, N17 9LZ
Approval of details pursuant to Condition 28 (Updated Construction Logistics Plan) relating to Demolition Phase 0 only of Planning Permission HGY/2016/4165
Granted Conditions Demolition 10 docs -
Cannon Factory and Ashley House, Ashley Road, London, N17 9LZ
Approval of details pursuant to Condition 13 (Tree Protection Plan) of Planning Permission HGY/2019/0108 (Appeal ref. APP/Y5420/W/19/3232707)
Granted Conditions Trees 10 docs -
Cannon Factory and Ashley House, Ashley Road, London, N17 9LZ
Approval of details pursuant to Condition 22 (Tree Protection Meeting) of Planning Permission HGY/2016/4165
Granted Conditions Trees 7 docs
Other full applications applications
In Haringey
-
HGY/2026/1488 Granted
203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ
Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch
-
HGY/2026/2208 Awaiting decision
21 The Grove Lynton Road, Hornsey, London, N8 8ST
Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.
-
HGY/2026/2340 Awaiting decision
Rowan, Muswell Road, Hornsey, London, N10 2BX
The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.
-
HGY/2026/2284 Awaiting decision
10 & 12 Gladesmore Road, London, N15 6TB
Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.
-
HGY/2026/2062 Awaiting decision
165 Priory Road, Hornsey, London, N8 8NB
Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.