Skip to content
PlanIndex Get alerts
Menu

Planning application

89 Gladesmore Road, Tottenham, London, N15 6TL

Awaiting decision Haringey HGY/2026/2138 Full planning permission

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a Type 3 roof extension

As published by the council, reference HGY/2026/2138

Application record

Reference
HGY/2026/2138
Type
Full planning permission
Status
Under Consultation
Received
27 Jul 2026
Validated
27 Jul 2026
Ward
South Tottenham
Decision by
Delegated Decision
Postcode
N15 6TL

Timeline

Dates from the published record

  1. 27 Jul 2026

    Received by Haringey

  2. 10 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Haringey took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Haringey for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 89 Gladesmore Road, Tottenham, London, N15 6TL

    HGY/2025/3537 Submitted 19 Dec 2025 0m away

    Replacement of existing slate roof with new slate covering. Repairs to chimney stack by repointing. Replacement of existing ground floor timber sash windows with casement windows on front, side, and rear elevations. Repair external wall decoration and repoint brick work. Repair boundary walls, fencing and paving stones. Replacement of existing timber front door with new door matching existing.

    Granted Full applications Roofing Windows or glazing 14 docs
  • 87 & 89 Gladesmore Road, London, N15 6TL

    HGY/2025/2406 Submitted 24 Sep 2025 0m away

    Erection of joint single-storey ground floor wraparound rear extensions to 87 and 89 Gladesmore Road N15

    Granted Householder Extension 10 docs
    Small domestic
  • 70 & 72 Gladesmore Road, Tottenham, London, N15 6TD

    HGY/2025/3605 Submitted 30 Dec 2025 30m away

    Erection of a joint ground floor wrap-around extension and Type 3 roof extensions with insertion of rooflights

    Granted Full applications Extension Loft or dormer 10 docs
  • 100 Lealand Road, Tottenham, London, N15 6JT

    HGY/2025/3095 Submitted 12 Nov 2025 58m away

    Lawful Development Certificate (Proposed Use) for the erection of a single-storey rear extension, measuring 3m in height, 5.4m in width, and 3m in depth

    Granted Lawful development Extension 5 docs
    Small domestic
  • 100-104 Lealand Road, London N15 6JT

    HGY/2026/1550 Submitted 2 Jun 2026 58m away

    Erection of a first floor rear extension to No. 100 to 104.

    Granted Full applications Extension 13 docs
  • 100 Lealand Road, Tottenham, London, N15 6JT

    HGY/2026/1551 Submitted 2 Jun 2026 58m away

    Erection of additional floor via "Type 3" Roof Extension to No.100.

    Granted Householder Extension 9 docs
    Domestic

In Haringey

  • HGY/2026/1488 Granted

    203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    10 Jul 2026 Full applications
  • HGY/2026/2208 Awaiting decision

    21 The Grove Lynton Road, Hornsey, London, N8 8ST

    Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.

    4 Sep 2026 Full applications
  • HGY/2026/2340 Awaiting decision

    Rowan, Muswell Road, Hornsey, London, N10 2BX

    The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.

    4 Sep 2026 Full applications
  • HGY/2026/2284 Awaiting decision

    10 & 12 Gladesmore Road, London, N15 6TB

    Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.

    3 Sep 2026 Full applications
  • HGY/2026/2062 Awaiting decision

    165 Priory Road, Hornsey, London, N8 8NB

    Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.

    2 Sep 2026 Full applications