Skip to content
PlanIndex Get alerts
Menu

Planning application

58 Oakfield Road, Hornsey, London, N4 4LB

Granted Haringey HGY/2025/3368 Full planning permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of existing timber windows with modern double glazed timber sash windows on front, flank and rear elevations.

As published by the council, reference HGY/2025/3368

Application record

Reference
HGY/2025/3368
Type
Full planning permission
Status
Decision Made
Decision
Approve with Conditions
Received
3 Dec 2025
Validated
3 Dec 2025
Decided
2 Feb 2026
Ward
Stroud Green
Decision by
Delegated Decision
Postcode
N4 4LB

Timeline

Dates from the published record

  1. 3 Dec 2025

    Received by Haringey

  2. 2 Feb 2026

    Decision issued: Approve with Conditions

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 88 Oakfield Road, Hornsey, London, N4 4LB

    HGY/2025/2840 Submitted 17 Oct 2025 0m away

    2nd Floor Roof Extension with Rear Dormer and 2 Flat Rooflights

    Granted Householder Extension Loft or dormer 6 docs
    Several homes
  • 86 Oakfield Road, Hornsey, London, N4 4LB

    HGY/2026/2377 Submitted 25 Aug 2026 0m away

    99% historically approved · decision due ~20 Oct

    (T1) Gladitisia - Proposing to reduce crown by up to 2m (height and lateral spread), in order to manage size of tree for this location (T2) Weeping Birch - Proposing to thin crown by up to 20%, in order to allow more light to rear of garden and maintain size and form of tree (T3) Neighbouring crab apple - Proposing to reduce branches overhanging the boundary back to boundary as crown has become phototropic due to positioning underneath adjacent trees, in order to encourage new, more upright growth

    Awaiting decision Trees 4 docs
  • 67 Oakfield Road, Hornsey, London, N4 4LD

    HGY/2025/2632 Submitted 8 Oct 2025 47m away

    Demolition of an existing conservatory and construction of a rear and side infill extension with angled roof, installation of Air Source Heat Pump to the front of the property, two roof lights, amendments to boundary treatment and solar panels to the rear roof slope.

    Granted Householder Extension Loft or dormer +1 29 docs
    Small domestic
  • 53 Oakfield Road, Hornsey, London, N4 4LD

    HGY/2024/3043 Submitted 5 Nov 2024 47m away

    Three trees in a private back garden. Propose minor works. T1 4m tall apple: one third crown volume reduction. T2 4m tall hazel and 3m tall T3 purple plum: reduce back to previous points.

    Granted Trees 6 docs
  • 63 Oakfield Road, Hornsey, London, N4 4LD

    HGY/2025/2556 Submitted 24 Sep 2025 47m away

    Conversion of single dwellinghouse into 2 self-contained 2-storey flats, erection of rear ground floor extension, erection of rear dormer, insertion of front rooflights, formation of roof terrace and associated works

    Granted Full applications New dwelling Extension +1 15 docs
    Domestic
  • 11 Elyne Road, Hornsey, London, N4 4RA

    HGY/2025/3585 Submitted 24 Dec 2025 52m away

    Erection of a single-storey side and rear extension, and formation of a rear dormer window to the main roof.

    Granted Householder Extension Loft or dormer +1 9 docs
    Small domestic

In Haringey

  • HGY/2026/1488 Granted

    203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    10 Jul 2026 Full applications
  • HGY/2026/2208 Awaiting decision

    21 The Grove Lynton Road, Hornsey, London, N8 8ST

    Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.

    4 Sep 2026 Full applications
  • HGY/2026/2340 Awaiting decision

    Rowan, Muswell Road, Hornsey, London, N10 2BX

    The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.

    4 Sep 2026 Full applications
  • HGY/2026/2284 Awaiting decision

    10 & 12 Gladesmore Road, London, N15 6TB

    Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.

    3 Sep 2026 Full applications
  • HGY/2026/2062 Awaiting decision

    165 Priory Road, Hornsey, London, N8 8NB

    Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.

    2 Sep 2026 Full applications