Planning application

537 Green Lanes, Hornsey, London, N8 0RL

Granted Haringey HGY/2024/2314 Full planning permission

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from Sui Generis (Launderette) to Class C3 residential for part of the ground floor to the rear; demolition of existing rear ground floor structure; erection of new extensions to the rear of the ground and first floor and at third floor (roof) level, and alterations to the internal layout to provide three residential units and a reduced commercial unit.

As published by the council, reference HGY/2024/2314

Application record

Reference
HGY/2024/2314
Type
Full planning permission
Status
Decision Made
Decision
Approve with Conditions
Received
20 Aug 2024
Validated
20 Aug 2024
Decided
25 Nov 2024
Ward
Harringay
Decision by
Delegated Decision
Postcode
N8 0RL

Timeline

Dates from the published record

  1. 20 Aug 2024

    Received by Haringey

  2. 25 Nov 2024

    Decision issued: Approve with Conditions

  3. 15 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Haringey

  • HGY/2026/1488 Granted

    203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    10 Jul 2026 Full applications
  • HGY/2026/2208 Awaiting decision

    21 The Grove Lynton Road, Hornsey, London, N8 8ST

    Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.

    4 Sep 2026 Full applications
  • HGY/2026/2340 Awaiting decision

    Rowan, Muswell Road, Hornsey, London, N10 2BX

    The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.

    4 Sep 2026 Full applications
  • HGY/2026/2284 Awaiting decision

    10 & 12 Gladesmore Road, London, N15 6TB

    Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.

    3 Sep 2026 Full applications
  • HGY/2026/2062 Awaiting decision

    165 Priory Road, Hornsey, London, N8 8NB

    Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.

    2 Sep 2026 Full applications