Skip to content
PlanIndex Get alerts
Menu

Planning application

16 Ossian Road, Hornsey, London, N4 4EA

Granted Haringey HGY/2023/0212 Full planning permission

Works: New dwelling Extension Loft or dormer Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of existing dwelling into 3no. flats. Reconstruction of existing second floor rear projection with new pitched roof, erection of single storey side/rear extension, formation of dormer, addition of 2no. rooflights and provision of bin/cycle stores.

As published by the council, reference HGY/2023/0212

Application record

Reference
HGY/2023/0212
Type
Full planning permission
Status
Decision Made
Decision
Granted As published: Approve with Conditions
Received
23 Jan 2023
Validated
23 Jan 2023
Decided
20 Mar 2023
Ward
Stroud Green
Decision by
Delegated Decision
Postcode
N4 4EA

Timeline

Dates from the published record

  1. 23 Jan 2023

    Received by Haringey

  2. 20 Mar 2023

    Decision issued: Approve with Conditions

  3. 25 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Haringey granted permission on 20 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 5 Ossian Road, Hornsey, London, N4 4DX

    HGY/2026/0638 Submitted 5 Mar 2026 50 yards away

    Group of mature Sycamore trees that are currently heavily clad in ivy at the rear of properties 1 - 11 Ossian Road. These trees belong to Parkland Walk - please see attached photos of email from Alex Fraser, Programme Manager, Urban Forest & Nature Recovery. T1 - T9: Group of mature Sycamore trees (Acer pseudoplatanus) : sensitive crown reduction on all trees to suitable pruning points, reducing the overall height of each tree by approximately 2 to 2.5 metres and reducing the lateral spread by approximately 2 metres. All pruning works will be carried out in accordance with BS3998:2010 – Tree Work Recommendations, ensuring that cuts are made to appropriate secondary growth points in order to retain the natural form, structural integrity, and vitality of the trees. As part of the works, the ivy currently covering the stems and primary scaffold branches will be carefully removed. The removal of ivy is recommended to support the long-term management and wellbeing of the trees. At present, the dense ivy coverage obscures the trunks and main structural unions, preventing effective visual inspection of the trees’ structural condition. This coverage may potentially conceal signs of decay, cavities, fungal fruiting bodies, or other structural defects. Removing the ivy will therefore allow the trees to be properly inspected and monitored in the future. In addition, ivy can increase wind loading within the crown and retain moisture against the bark, so its removal will assist in maintaining better physiological conditions for the trees. Reason for works: The crowns of these trees are demonstrating extensive deadwood, and have gradually expanded and are now restricting light levels into the rear gardens and properties of six adjoining residential dwellings. The proposed crown reduction is intended to improve daylight penetration into the gardens and rear elevations of these properties while maintaining the trees within a size that is appropriate for their garden setting. The works also form part of an ongoing management approach, as similar reduction works have previously been carried out on the trees. All green waste generated during the works will remain on site. The arisings will be cut and stacked in neat habitat piles in suitable locations, as requested by the Programme Manager at the Urban Forest & Nature Recovery Programme. This approach will provide valuable habitat for invertebrates and other small wildlife while supporting local biodiversity objectives and avoiding the unnecessary removal of organic material from the site.

    Granted Trees 9 docs
  • Flat A, 32, Ossian Road, London, N4 4EA

    HGY/2019/2873 Submitted 30 Oct 2019 50 yards away

    Installation of 2 roof windows in loft, on the rear / north side of the roof.

    Granted Full applications Windows or glazing 8 docs
  • 32, Ossian Road, London, N4 4EA

    HGY/2021/1565 Submitted 7 Jun 2021 50 yards away

    Replacement of ground floor front windows with double glazed timber sash units to match the existing. Replacement of 2 metal framed ground floor rear windows with uPVC units.

    Granted Full applications Windows or glazing 14 docs
  • 45 Ferme Park Road, Hornsey, London, N4 4EB

    HGY/2026/0719 Submitted 13 Mar 2026 100 yards away

    G1 Plum - Fell by way of controlled dismantle down to ground level or as close to grade as possible T1 Pear - Crown reduction by removing approximately (30%) 4.0 metres growth in height and reshaping spread pruning back to suitable growth points to leave a balanced crown. T2 Sycamore - Crown reduction by removing approximately (30%) 5.0 metres growth in height and reshaping spread pruning back to suitable growth points to leave a balanced crown. (Tree previously Pollarded)

    Granted Trees 5 docs
  • Flat A, 33 Ferme Park Road, Hornsey, London, N4 4EB

    HGY/2024/2957 Submitted 25 Oct 2024 100 yards away

    Crown reduction by a third of a 18ft tall bay tree in rear garden of Flat A, 33 Ferme Park Road. It is the only tree marked on the sketch plan.

    Granted Trees 5 docs
  • Ground Floor Flat, 29 Ferme Park Road, Hornsey, London, N4 4EB

    HGY/2026/1979 Submitted 4 Sep 2026 100 yards away

    99% historically approved · decision due ~30 Oct

    Approval of details reserved by condition 3 (CMP) attached to permission ref: HGY/2025/2196

    Awaiting decision Conditions

In Haringey

  • HGY/2026/1917 Granted

    30, 32 & 34 Elm Park Avenue, London, N15 6AU

    Erection of a ground floor rear extension at No. 32, first floor rear extensions across Nos. 30, 32 and 34 and the erection of a porch extension to the front of No.32.

    Received 22 Jul, published by the council 24 Jul 2026 Full applications
  • HGY/2026/1085 Granted

    58 Ellenborough Road, Wood Green, London, N22 5EY

    Change of use of a single family dwellinghouse (Class C3) to a small House in Multiple Occupation (HMO) (Class C4) with 5 bedrooms for a maximum of 5 occupants including the provision of waste and cycle storage.

    Received 7 May, published by the council 24 Jul 2026 Full applications
  • HGY/2026/0993 Granted

    80, Wightman Road, London, N4 1RU

    The conversion of an existing garage/store and erection of a first floor to form a three bedroom dwellinghouse

    Received 7 Apr, published by the council 24 Jul 2026 Full applications
  • HGY/2026/1425 Awaiting decision

    63 Park Ridings, Wood Green, London, N8 0LB

    Change of use from a single dwelling (Use Class C3) to a House in Multiple Occupation (Use Class C4) (retrospective), with proposed refuse/recycling and cycle storage.

    Received 11 Sep, published by the council 17 Sep 2026 Full applications
  • HGY/2026/2303 Awaiting decision

    8 Middle Lane, Hornsey, London, N8 8PL

    Erection of an additional set-back storey at roof level to provide 1 no. one-bedroom, two-person residential dwelling (Use Class C3), increasing the development approved under planning permission HGY/2025/2512 from four to five residential units, together with amendments to the approved scheme.

    Received 11 Sep, published by the council 17 Sep 2026 Full applications