Planning application

HS2 Melton Street LU Sub Station Compound, Land to the South of, Euston Station, London, NW1 2BT

Granted Haringey HGY/2021/2814 Observations for Adjoining Borough

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for approval under Schedule 17 of High Speed Rail (London - West Midlands) Act 2017 of lorry routes to and from the Melton Street LU Substation associated with the construction, excavation and above ground construction of the replacement London Underground Traction Substation and Vent Shaft. Main works activities include: capping beam, propping and excavation of the piled box; RC structures; headhouse fit out and envelope; Mechanical, Electrical, Plumbing and Heating (MEPH) and associated enabling works. Incorporating lorry routes via: Transport for London Road Network (TLRN), Melton Street, Cardington Street, Albany Street, Osnaburgh Terrace, Osnaburgh Street and Great Portland Street. (Observations to L.B. Camden - their reference 2021/4406/HS2)

As published by the council, reference HGY/2021/2814

Application record

Reference
HGY/2021/2814
Type
Observations for Adjoining Borough
Status
Decision Made
Decision
Granted As published: No Objection
Received
14 Sep 2021
Validated
14 Sep 2021
Decided
5 Oct 2021
Ward
Not Applicable - Outside Borough
Decision by
Delegated Decision
Postcode
NW1 2BT

Timeline

Dates from the published record

  1. 14 Sep 2021

    Received by Haringey

  2. 5 Oct 2021

    Decision issued: No Objection

  3. 11 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Haringey granted permission on 5 October 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.