Proposal
Rear dormer on the main roof slope with a dormer on the rear outrigger and roof lights to the front roof slope.
As published by the council, reference HGY/2021/1801
Application record
- Reference
- HGY/2021/1801
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Approve with Conditions
- Received
- 15 Jun 2021
- Validated
- 15 Jun 2021
- Decided
- 23 Jul 2021
- Ward
- Alexandra
- Decision by
- Delegated Decision
- Postcode
- N22 7AQ
Timeline
Dates from the published record
-
15 Jun 2021
Received by Haringey
-
23 Jul 2021
Decision issued: Approve with Conditions
-
25 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Haringey granted permission on 23 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
173 Albert Road, Wood Green, London, N22 7AQ
Conversion of the first floor flat's loft including the formation of dormer roof extensions to the main roof slope and to the outrigger roof slope, and the installation of two rooflights to the front slope & two rooflights to the pediment.
Granted Full applications Extension Loft or dormer 6 docs -
46 Clifton Road, Wood Green, London, N22 7XN
Erection of single storey extension which extends beyond the rear wall of the original house by 5m, for which the maximum height would be 3.5m and for which the height of the eaves would be 2.2m
Decided Prior approval Extension 9 docsSmall domestic -
38, Clifton Road, London, N22 7XN
Certificate of lawfulness: Single storey infill on the rear elevation (south) matching the existing single storey extension.
Granted Lawful development Extension 12 docsSmall domestic -
56, Harcourt Road, London, N22 7XW
Works to tree protected by a TPO T1- Silver Birch tree (15m) with crown die back and trunk with large cavity - reduce trunk with cavity by approximately 5 metres, reduce remainder of tree by approximately 2 metres, remove dead branches. The proposed 5 metre reduction of the trunk with the cavity is to reduce the risk of trunk failure whilst maintaining the tree, the reduction of the remaining crown is to balance the crown.
Granted Trees 9 docs -
170, Albert Road, London, N22 7AH
Erection single storey rear infill extension and rear steps to garden.
Granted Full applications Extension 14 docsSmall domestic -
18 Harcourt Road, Wood Green, London, N22 7XW
Demolition of existing rear timber terrace structure & stairs. Erection of two-storey rear ground floor and basement extension
Granted Householder Extension Demolition 13 docsDomestic
Other full applications
In Haringey
-
HGY/2026/1488 Granted
203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ
Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch
-
HGY/2026/2208 Awaiting decision
21 The Grove Lynton Road, Hornsey, London, N8 8ST
Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.
-
HGY/2026/2340 Awaiting decision
Rowan, Muswell Road, Hornsey, London, N10 2BX
The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.
-
HGY/2026/2284 Awaiting decision
10 & 12 Gladesmore Road, London, N15 6TB
Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.
-
HGY/2026/2062 Awaiting decision
165 Priory Road, Hornsey, London, N8 8NB
Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.