6, Donovan Avenue, London, N10 2JX

Granted Haringey HGY/2021/1787 Full planning permission

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Infill extension below existing balcony, creation of lightwell and storage area to front garden, upper ground floor rear extension, recladding of existing bay window and new rear dormer roof extension

As published by the council, reference HGY/2021/1787

Application record

Reference
HGY/2021/1787
Type
Full planning permission
Status
Decision Made
Decision
Approve with Conditions
Received
11 Jun 2021
Validated
11 Jun 2021
Decided
6 Aug 2021
Ward
Alexandra
Decision by
Delegated Decision
Postcode
N10 2JX

Timeline

Dates from the published record

  1. 11 Jun 2021

    Received by Haringey

  2. 6 Aug 2021

    Decision issued: Approve with Conditions

  3. 15 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 12, Donovan Avenue, London, N10 2JX

    HGY/2021/1255 Submitted 20 Apr 2021 14m away

    Non-material amendment application to HGY/2020/0921 to incorporate the following changes: 1. Floor level in the living/ dining area on the lower ground floor, adjacent to 10 Donovan Avenue to be reduced, to match the levels in the rest of the lower ground floor. 2. An additional two roof lights on the front elevation, making a total of three. 3. A new boundary wall to the front garden to be constructed to match original typical front boundary walls found in Muswell Hill Conservation Area with a new timber oak entrance gate. 4. The existing lightwell adjacent to the external stair in the front garden will be extended and covered to create below ground secure cycle storage.

    Granted Amendments Loft or dormer 22 docs
    Small domestic
  • 10, Donovan Avenue, London, N10 2JX

    HGY/2021/2095 Submitted 9 Jul 2021 18m away

    Construction of a single storey rear infill extension, Alterations to window openings in rear elevation, Conservation rooflights to front roof slope, Removal of render and restoration of brickwork to front elevation and Boundary wall and landscaping to front garden.

    Granted Full applications Extension Loft or dormer +1 24 docs
    Small domestic
  • 12 Donovan Avenue, London, N10 2JX

    HGY/2024/2873 Submitted 18 Oct 2024 30m away

    Copper cherry at end of garden needs canopy reduction by 20%. The tree is about 10m tall, and the reduction will entail taking about 2m (20%) off the crown.

    Granted Trees 4 docs
  • 8, Donovan Avenue, London , N10 2JX

    HGY/2026/0334 Submitted 9 Feb 2026 30m away

    Non-Material Amendment application following a grant of planning permission HGY/2021/1358 in relation to the repositioning of the front rooflights; changes to the size/shape/position of the rear rooflights; changes to the external fenestration/materials to the rear dormers; changes from 2x new windows to the ground floor rear extension to a set of 3 windows; changes to the external brickwork finish at the lower ground level to rear elevation; and minor internal changes to the floor layout.

    Granted Amendments Extension Loft or dormer +1 11 docs
  • Flat B, 14 Donovan Avenue, Hornsey, London, N10 2JX

    HGY/2026/1519 Submitted 1 Jun 2026 30m away

    T1 eucalyptus- reduce from 12m to 9m (to previous reduction points) Remove suckers at base of trunk

    Granted Trees 3 docs
  • 22 Donovan Avenue, Hornsey, London, N10 2JX

    HGY/2025/2248 Submitted 19 Aug 2025 30m away

    Back garden: bay (T1) - reduce height by 2.5m to height of trimmed section and shape. Reason: to allow more light and space into the gardens.

    Granted Trees 3 docs

In Haringey

  • HGY/2026/1488 Granted

    203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    10 Jul 2026 Full applications
  • HGY/2026/2208 Awaiting decision

    21 The Grove Lynton Road, Hornsey, London, N8 8ST

    Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.

    4 Sep 2026 Full applications
  • HGY/2026/2340 Awaiting decision

    Rowan, Muswell Road, Hornsey, London, N10 2BX

    The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.

    4 Sep 2026 Full applications
  • HGY/2026/2284 Awaiting decision

    10 & 12 Gladesmore Road, London, N15 6TB

    Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.

    3 Sep 2026 Full applications
  • HGY/2026/2062 Awaiting decision

    165 Priory Road, Hornsey, London, N8 8NB

    Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.

    2 Sep 2026 Full applications