Planning application

Hale Wharf, Ferry Lane, London, N17 9NF

Granted Haringey HGY/2019/3018 Approval of details reserved by a condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Approval of details pursuant to condition A30 (completion of remediation and a report that provides verification that the required works have been carried out) attached to the Hybrid Planning Permission Reference: HGY/2016/1719 - Part discharge.

As published by the council, reference HGY/2019/3018

Application record

Reference
HGY/2019/3018
Type
Approval of details reserved by a condition
Status
Decision Made
Decision
Granted As published: Approve with Conditions
Received
24 Oct 2019
Validated
24 Oct 2019
Decided
19 Dec 2019
Ward
Tottenham Hale
Decision by
Delegated Decision
Postcode
N17 9NF

Timeline

Dates from the published record

  1. 24 Oct 2019

    Received by Haringey

  2. 19 Dec 2019

    Decision issued: Approve with Conditions

  3. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Haringey granted permission on 19 December 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Windlass Apartments, 4 Hale Wharf, Ferry Lane, Tottenham, London, N17 9QH

    HGY/2024/2442 Submitted 6 Sep 2024 50 yards away

    2no. Non-Illuminated Projecting ID signs (0.65m X 0.55m X 0.11m) to be installed on Blocks C and K.

    Granted Advertising 4 docs
  • Ground Floor Commercial Unit, Approach House, Hale Wharf, Ferry Lane, Tottenham, London, N17 9AD

    HGY/2026/0023 Submitted 6 Jan 2026 50 yards away

    Installation of new kitchen extract system in association with ground floor restaurant use

    Granted Full applications 16 docs
  • Block K Ground Floor Commercial Unit, Hale Wharf, Ferry Lane, London, N17 9NF

    HGY/2024/2653 Submitted 27 Sep 2024 100 yards away

    Change of use from permitted commercial use (Use Class E (a) (b) (c) and Sui Generis) to residential amenity space (Use Class C3).

    Withdrawn Full applications 7 docs
  • Hale Service Centre, Old Filling Station,, Ferry Lane, London, N17 9NG

    HGY/2024/1921 Submitted 11 Jul 2024 150 yards away

    Retrospective application for retention of scaffolding structure for a temporary period to facilitate wall repairs and maintenance to main service centre building.

    Granted Full applications 10 docs
  • The Ferry Boat Inn Public House, 1, London, N17 9NG

    260032 Submitted 7 Jan 2026 150 yards away

    Decision due ~4 Mar

    Installation of replacement signs including 1 x externally illuminated pole mounted sign, 2 x externally illuminated fascia signs and 2 x non-illuminated freestanding post signs.

    Status unknown Advertising
  • The Ferry Boat Inn Public House, 1, London, N17 9NG

    260031 Submitted 7 Jan 2026 150 yards away

    Decision due ~4 Mar

    External alterations involving renovation of the existing facades and window frames along with new signage and external lighting. Works include construction of a new timber-clad external bar, extension of existing pergola in connection with relocated fixed seating booths, construction of a replacement rear storage shed, installation of raised timber decking platform to accommodate additional seating, refurbishment of the existing patio area including tiled insets and installation of external lighting including wall mounted hanging lights to the front elevation.

    Status unknown Full applications Extension Windows or glazing
    Small domestic

In Haringey

  • HGY/2026/1915 Granted

    12 Canning Crescent, Wood Green, London, N22 5SR

    Approval of details reserved by a condition 10 (Landscape), condition 12 (Method of Construction Statement), condition 13 (investigative work - contaminants), condition 15 (NRMM), condition 16 (Air Quality and Dust Management Plan), and condition 17 (Considerate Constructors Scheme) attached to planning application Ref: HGY/2024/3115

    Received 7 Jul, published by the council 24 Jul 2026 Conditions
  • HGY/2026/2763 Awaiting decision

    11 Sheldon Avenue, Hornsey, London, N6 4JS

    Approval of details pursuant to conditions 4 (Refuse and Cycle Storage), 5 (Cycle Parking), 6 (Hard and Soft Landscaping), 12 (ASHP), 13 (Water Butt) and 16 (Self-build Dwelling) attached to planning permission ref: HGY/2024/2154.

    Received 6 Oct, published by the council 11 Oct 2026 Conditions
  • HGY/2025/3223 Granted

    98 High Street, Hornsey, London, N8 7NT

    Approval of Details pursuant to condition 3 (materials) ref: HGY/2024/2879

    Received 21 Nov, published by the council 25 Jul 2026 Conditions
  • HGY/2026/2587 Granted

    Tottenham Substation, Watermead Way, London, N17 0SG

    Approval of Schedule 2 Requirement 11 (1 and 2) (Contaminated Land and Groundwater) relating to Stage 4a (as approved under HGY/2026/0364) of The National Grid (North London Reinforcement Project) Order 2014 attached to development consent order HGY/2014/3601

    Received 16 Sep, published by the council 23 Sep 2026 Conditions
  • HGY/2025/1866 Granted

    1-6 Crescent Mews, Hornsey, London, N22 7GG

    Approval of details pursuant to condition 24 (Overheating Report) attached to planning permission HGY/2019/1183

    Received 20 Feb, published by the council 25 Jul 2026 Conditions