Skip to content
PlanIndex Get alerts
Menu

Planning application

73, Upper Tollington Park, London, N4 4DD

Granted Haringey HGY/2019/2884 Full planning permission

Works: New dwelling Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of a single storey rear and side extension and internal remodelling to convert the property from a single family dwelling into 3 x self-contained flats.

As published by the council, reference HGY/2019/2884

Application record

Reference
HGY/2019/2884
Type
Full planning permission
Status
Decision Made
Decision
Approve with Conditions
Received
4 Nov 2019
Validated
4 Nov 2019
Decided
19 Dec 2019
Ward
Stroud Green
Decision by
Delegated Decision
Postcode
N4 4DD

Timeline

Dates from the published record

  1. 4 Nov 2019

    Received by Haringey

  2. 19 Dec 2019

    Decision issued: Approve with Conditions

  3. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

33 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 59 Upper Tollington Park, Hornsey, London, N4 4DD

    HGY/2024/3051 Submitted 6 Nov 2024 28m away

    Two proposed side dormers.

    Refused Householder Loft or dormer 7 docs
    Domestic
  • Flat C, 38 Upper Tollington Park, Hornsey, London, N4 4BX

    HGY/2023/0214 Submitted 23 Jan 2023 46m away

    Erection of rear dormer and insertion of 2 x rooflights to front elevation to facilitate a loft conversion.

    Granted Full applications Loft or dormer 14 docs
  • Flat C, 56 Upper Tollington Park, Hornsey, London, N4 4BX

    HGY/2022/3849 Submitted 21 Oct 2022 46m away

    Installation of rear dormer window, addition of two front rooflights, replacement of second floor windows and re-roofing with natural slates.

    Refused Full applications Loft or dormer Windows or glazing 5 docs
  • 85, Upper Tollington Park, London, N4 4LP

    HGY/2019/3336 Submitted 29 Nov 2019 52m away

    Non-material amendment following a grant of planning permission HGY/2019/1064 involving the replacement of existing concrete roof tiles with natural slate roof tiles to the main and rear outrigger roofs.

    Granted Amendments Extension Roofing 8 docs
  • 5 Florence Road, Hornsey, London, N4 4BU

    HGY/2024/3123 Submitted 13 Nov 2024 80m away

    My report firmly recommends that the Ash tree within the front garden is fully and permanently removed, owing to the high risk of the tree and its roots causing subsidence in future years. Specifically, pollarding is considered cost inefficient and inadequate for this type of fast growing tree. An arboriculturist should advise on any permissions required from the Council.

    Granted Trees 4 docs
  • 7, Victoria Road, London, N4 3SH

    HGY/2019/2863 Submitted 1 Nov 2019 87m away

    Single storey rear extension, installation of 2 rear dormers and 2 front rooflights, in association with conversion of property into 3 self-contained flats.

    Granted Full applications New dwelling Extension +1 11 docs
    Small domestic

In Haringey

  • HGY/2026/1488 Granted

    203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    10 Jul 2026 Full applications
  • HGY/2026/2208 Awaiting decision

    21 The Grove Lynton Road, Hornsey, London, N8 8ST

    Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.

    4 Sep 2026 Full applications
  • HGY/2026/2340 Awaiting decision

    Rowan, Muswell Road, Hornsey, London, N10 2BX

    The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.

    4 Sep 2026 Full applications
  • HGY/2026/2284 Awaiting decision

    10 & 12 Gladesmore Road, London, N15 6TB

    Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.

    3 Sep 2026 Full applications
  • HGY/2026/2062 Awaiting decision

    165 Priory Road, Hornsey, London, N8 8NB

    Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.

    2 Sep 2026 Full applications