Planning application
Car Park CP2 The Commons Market Harborough Leicestershire
Relates to 25/01728/FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Conditions 3 (Solar Canopy Painting Scheme) and 4 (Feeder Pillar Enhancement Scheme) of 25/01728/FUL
As published by the council, reference 26/00795/PCD
Application record
- Reference
- 26/00795/PCD
- Status
- Approved
- Decision
- Granted As published: Approve
- Validated
- 8 Jun 2026
- Decided
- 14 Sep 2026
Site history
Applications at this address on the Harborough register
This site has had 3 applications since 2025: 3 approved, 0 refused.
-
25/01728/FUL Granted
Car Park CP2 The Commons Market Harborough Leicestershire
Erection of an Electric Vehicle Charging Hub and Solar Canopy (comprising 41.73kW Solar Photovoltaics on the roof of the solar canopy, a 30kWh Battery Energy Storage System and 12no. 11kW Electric Vehicle Charging Points (EVCPs) delivered via six dual socket charging posts) (revised scheme of 24/01412/FUL)
-
25/01152/DDD Granted
Car Park CP2 The Commons Market Harborough Leicestershire
Reduce the tree in size to a height of 8m-9m above ground level and to reduce lateral branches to make a more compact canopy, to reduce risk to the highway
Timeline
Dates from the published record
-
8 Jun 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
14 Sep 2026
Decision issued: Approve
-
14 Sep 2026
Status changed to Approved
Previously Pending Consideration.
Related applications
Cases linked to this one on the register
-
25/01728/FUL Granted
Car Park CP2 The Commons Market Harborough Leicestershire
Erection of an Electric Vehicle Charging Hub and Solar Canopy (comprising 41.73kW Solar Photovoltaics on the roof of the solar canopy, a 30kWh Battery Energy Storage System and 12no. 11kW Electric Vehicle Charging Points (EVCPs) delivered via six dual socket charging posts) (revised scheme of 24/01412/FUL)
What this grant of permission means
Harborough granted permission on 14 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Harborough's portal will say. Our guide explains the common types.