Skip to content
PlanIndex Get alerts
Menu

Planning application

Hall Farm Beeby Road Scraptoft Leicestershire LE7 9SJ

Granted Harborough 19/00264/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a one and a half storey rear extension to form an annexe to the existing dwelling and garage conversion (resubmission of 18/02068/FUL)

As published by the council, reference 19/00264/FUL

Application record

Reference
19/00264/FUL
Type
Full Application
Status
Approved
Decision
Approve
Received
19 Feb 2019
Validated
11 Mar 2019
Decided
16 May 2019
Ward
Thurnby And Houghton
Parish
Scraptoft
Decision by
Delegated
Postcode
LE7 9SJ

Timeline

Dates from the published record

  1. 19 Feb 2019

    Received by Harborough

  2. 11 Mar 2019

    Validated

    Checked as complete and ready for consideration.

  3. 16 May 2019

    Decision issued: Approve

  4. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Hall Farm Barn Beeby Road Scraptoft Leicestershire LE7 9SJ

    22/01583/FUL Submitted 30 Aug 2022 23m away

    Proposed conversion of annexe into a separate dwelling, alteration to the curtilage, provision of parking and access to serve the proposed dwelling, proposed boundary treatments and associated alterations

    Granted Full applications 12 docs
    Domestic
  • Hall Farm Barn Beeby Road Scraptoft Leicestershire LE7 9SJ

    22/00765/FUL Submitted 24 Mar 2022 41m away

    Erection of front gates and wall, and wall within front courtyard between dwelling and outbuilding

    Granted Full applications 7 docs
    Small domestic
  • Hall Farm Barn Beeby Road Scraptoft Leicestershire LE7 9SJ

    22/01654/FUL Submitted 9 Sep 2022 44m away

    Change of use of barn from incidental residential (C3 Use) to beauty treatment premises (Sui Generis Use), including use of the land to the rear, provision of parking, access and associated alterations (retrospective)

    Granted Full applications 15 docs
  • The Dairy Beeby Road Scraptoft Leicestershire LE7 9SJ

    25/01651/FUL Submitted 28 Nov 2025 82m away

    Demolition of existing outbuilding and erection of a single storey extension, and change of use of land from agricultural paddock to residential curtilage (C3 Use)

    Granted Full applications Extension Demolition 21 docs
    Small domestic
  • Land At Beeby Road Scraptoft Leicestershire

    25/00430/SCR Submitted 27 Mar 2025 170m away

    Request for Screening Opinion in accordance with Regulation 6 the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for proposed development of up to 200 dwellings, access, open space, landscape, drainage and associated infrastructure/works

    Decided Outline 2 docs
    Major scheme
  • Land At Beeby Road Scraptoft Leicestershire

    25/00767/OUT Submitted 2 Jun 2025 170m away

    91% historically approved · decision due ~12 Aug

    Outline application for the erection of up to 200 dwellings, open space, landscape, drainage and associated infrastructure and works (access to be considered)

    Awaiting decision Outline 98 docs
    Major scheme

In Harborough

  • 26/00918/FUL Refused

    59 Northleigh Grove Market Harborough Leicestershire LE16 9QU

    Erection of two storey front extension including garage, new entrance and bay window; first-floor side extension; and part two storey part single storey rear extension including balcony

    25 Jun 2026 Full applications
  • 26/00139/FUL Granted

    Land Adj HM Prison Welland Avenue Gartree Lubenham Leicestershire

    Widening of existing access for Anglian Water pumping station (pumping station approved as part of reserved matters planning permission 24/00200/REM)

    30 Jan 2026 Full applications
  • 25/00608/FUL Granted

    Land North Of Dingley Road Great Bowden Leicestershire

    Erection of 11 dwellings, including two affordable bungalows

    1 May 2025 Full applications
  • 26/00693/FUL Awaiting decision

    The Granary High Street Husbands Bosworth Leicestershire LE17 6LJ

    Erection of a timber framed and clad garden store

    Full applications
  • 26/01126/FUL Awaiting decision

    Old Queen House 7 Springbank Medbourne Leicestershire LE16 8EB

    Re-roof existing flat roof extension, internal remodelling, revisions to fenestration, and erection of a garden shed

    Full applications