Skip to content
PlanIndex Get alerts
Menu

Planning application

P/2026/01444/DET

West 12 Shopping Centre Shepherd'S Bush Green, London, W12 8PP

Granted Hammersmith and Fulham Details to Meet Conditions Full/Outline

Proposal

Submission of details of construction management plan and construction logistics plan pursuant to condition 9 of planning permission ref: 2025/01303/FUL granted 28th May 2026.

As published by the council, reference P/2026/01444/DET

Timeline

Dates from the published record

  1. 5 Jun 2026

    Received by Hammersmith and Fulham

  2. 16 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Decision issued: APPLICATION APPROVED

  4. 24 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 2026/00315/FUL Awaiting decision

    West 12 Shopping Centre Shepherd's Bush Green London W12 8PP

    Change of use of part of the building at second floor level (4,660 sqm floorspace) from cinema (Class Sui Generis) to a padel court centre (Use Class E(d)).

    6 Feb 2026 0m away Full applications
  • 2026/00316/ADV Awaiting decision

    West 12 Shopping Centre Shepherd's Bush Green London W12 8PP

    Display of 2no internally halo illuminated fascia signs to replace 2no existing signs and 1no existing led listing display board to the northern elevation (facing Shepherd's Bush Green), alterations to 1no existing projecting sign to include the installation of updated vinyl to the western elevation (facing Rockley Road) and alterations to 1no existing fascia sign to include the installation of updated vinyl to the southern elevation (facing Charecroft Way) of the building.

    6 Feb 2026 0m away Advertising
  • 2002/01044/FUL Granted

    7 Rockley Road London W14 0DJ

    Use of the pavement on Rockley Road to provide 3 tables and 12 chairs; erection of portable canvas barriers, in connection with existing restaurant use.

    8 Aug 2002 32m away Full applications
  • 2011/02961/ADV Split decision

    Atlantic House 1 Rockley Road London W14 0DJ

    Proposal 1 - Display of internally illuminated logo and letterset sign on Rockley Road (sign 1), display of internally illuminated projecting box sign on Rockley Road (sign 2), display of internally illuminated letter sign on Rockley Road (Sign 3), display of internally illuminated `totem` sign on Rockley Road (Sign 4), display of non-illuminated logo sign on Charecroft Way (Sign 7), display of internally illuminated letterset sign on Charecroft Way (Sign 8); Proposal 2 - display of internally illuminated sign at a high level, facing towards Shepherds Bush Green (Sign 5), and display of internally illuminated high level letterset sign on flank elevation facing towards Shepherds Bush roundabout (Sign 6).

    26 Sep 2011 32m away Advertising
  • 2003/01083/FUL Decided

    7 Rockley Road London W14 0DJ

    xx

    9 Apr 2003 32m away Full applications
  • 2025/00704/ADV Granted

    Pavement Outside 29 Shepherd's Bush Green London W12 8PH

    Display of two internally illuminated digital advertisement LCD screens to a proposed BT Street Hub 3 unit following the removal of the existing BT InLink unit located on the Pavement Outside 29 Shepherd's Bush Green.

    11 Mar 2025 69m away Advertising

In Hammersmith and Fulham

  • P/2026/01938/DET Awaiting decision

    421 A North End Road,London,Hammersmith And Fulham,SW6 1NY

    Submission of details of full postal address pursuant to condition 9; parking permit scheme pursuant to condition 11; water efficient appliances pursuant to condition 13; mechanical ventilation system pursuant to condition 14; Ultra Low Nox Gas fired boilers to be provided for space heating and domestic hot water pursuant to condition 15; construction logistics plan pursuant to condition 17 of planning permission ref: 2017/03185/FUL granted 19th October 2017.

    29 Jul 2026 Conditions
  • Former Bbc Television Centre Wood Lane, London

    Details to discharge Condition 58 ( Car Parking Management Plan ) for Plot E & G1, of planning permission (ref. 2016/04585/VAR) dated 22 August 2017.

    30 Apr 2026 Conditions
  • P/2026/01913/DET Awaiting decision

    11 Farm Lane, London, SW6 1PU

    Submission of details of the installation/commissioning reports of the Zero Emission MCS certified Air Source Heat Pumps to be provided for space heating and hot water for the thirty-one self-contained residential units, pursuant to Condition 18 of planning permission reference: 2022/03329/FR3 dated 19th July 2023.

    27 Jul 2026 Conditions
  • P/2026/01912/DET Awaiting decision

    43 Brook Green, London, W6 7EF

    Submission of details of a post construction BREEAM assessment pursuant to condition 35 of planning permission ref: 2022/00949/FUL granted 13th July 2023.

    27 Jul 2026 Conditions
  • P/2026/01906/DET Awaiting decision

    156 Munster Road, London, SW6 5RA

    Submission of details of details of the following external facing materials (including manufacturer's specifications, photographs) pursuant to condition 3; preliminary risk assessment report pursuant to condition 10; site investigation scheme pursuant to condition 11; quantitative risk assessment report pursuant to condition 12; remediation method statement pursuant to condition 13; verification report pursuant to condition 14; onward long-term monitoring methodology report pursuant to condition 15; enhanced sound insulation value DnT,w + Ctr L'nT,w of at least 10dB above the Building Regulations value, for the floor/ceil-ing /wall structures separating different types of rooms/ uses in adjoining dwellings, namely [eg. living room and kitchen above bedroom of separate dwelling] pursuant to condition 16; sound insulation of the floor/ ceiling/walls separating the commercial parts of the premises from dwellings pursuant to condition 17; detailed Demolition and Construction Logistics Plan... read more

    25 Jul 2026 Conditions