Proposal
Partial discharge of condition relating to submission of details of materials and a sample panel pursuant to condition 19 of planning permission ref: 2023/03048/VAR granted 20th June 2024.
As published by the council, reference 2026/00016/DET
Timeline
Dates from the published record
-
6 Jan 2026
Received by Hammersmith and Fulham
-
9 Jan 2026
Validated
Checked as complete and ready for consideration.
-
27 Feb 2026
Decision issued: APPLICATION APPROVED
-
24 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
2026/00347/NMAT Granted
80 Fulham Palace Road, London, W6 9PL
Non-material amendment to planning permission reference: 2023/03048/VAR dated 20th June 2024 for the "Variation of Condition 2 (approved drawings), Condition 15 (Flood Risk Assessment), Condition 23 (Ventilation Strategy), Condition 28 (Waste Management) and Condition 29 (Cycle Storage) of the planning permission reference: 2021/03522/FUL dated 15th December 2022 for the 'Demolition of the existing building except retention of existing front and side facades; and erection of a 3 storey plus basement and mansard roof hotel and reprovision of public house.' Amendments sought to facilitate alterations to the facade and window arrangements, alterations to pub frontage, reconfiguration of PV and acoustic screen at roof level, increase of headroom at basement level, and changes to waste and SuDS Strategy." The amendments sought relate to the omission of the roof plant screen, the extension of the parapet, the omission of 3no. dormer windows at third floor level, and minor alterations to s... read more
-
2026/00350/NMAT Granted
80 Fulham Palace Road, London, W6 9PL
Non-material amendment to planning permission reference: 2023/03048/VAR dated 20th June 2024 for the "Variation of Condition 2 (approved drawings), Condition 15 (Flood Risk Assessment), Condition 23 (Ventilation Strategy), Condition 28 (Waste Management) and Condition 29 (Cycle Storage) of the planning permission reference: 2021/03522/FUL dated 15th December 2022 for the 'Demolition of the existing building except retention of existing front and side facades; and erection of a 3 storey plus basement and mansard roof hotel and reprovision of public house.' Amendments sought to facilitate alterations to the facade and window arrangements, alterations to pub frontage, reconfiguration of PV and acoustic screen at roof level, increase of headroom at basement level, and changes to waste and SuDS Strategy." Amendments sought for alterations to internal layouts, decrease in the extent of basement excavation and adjustment to floor level, changes in design to the refuse store doors, changes ... read more
-
2026/00242/DET Granted
80 Fulham Palace Road, London, W6 9PL
Submission of details of a Ventilation Strategy Report, pursuant to Condition 23 of the planning permission reference: 2023/03048/VAR dated 20th June 2024.
-
2025/03522/DET Granted
80 Fulham Palace Road, London, W6 9PL
Submission of full details of all materials and a sample panel, pursuant to Condition 19 of the planning permission reference: 2023/03048/VAR dated 20th June 2024.
-
P/2026/00852/DET Granted
80 Fulham Palace Road, London, W6 9PL
Submission of drawings at a scale of 1:20 in plan, section and elevation of all external windows, to partially discharge Condition 22 of planning permission reference: 2023/03048/VAR dated 20th June 2024.
-
P/2026/01027/DET Granted
80 Fulham Palace Road, London, W6 9PL
Submission of full details of all materials and a sample panel, to partially discharge Condition 19 of planning permission reference: 2023/03048/VAR dated 20th June 2024.
Other conditions applications
In Hammersmith and Fulham
-
P/2026/01938/DET Awaiting decision
421 A North End Road,London,Hammersmith And Fulham,SW6 1NY
Submission of details of full postal address pursuant to condition 9; parking permit scheme pursuant to condition 11; water efficient appliances pursuant to condition 13; mechanical ventilation system pursuant to condition 14; Ultra Low Nox Gas fired boilers to be provided for space heating and domestic hot water pursuant to condition 15; construction logistics plan pursuant to condition 17 of planning permission ref: 2017/03185/FUL granted 19th October 2017.
-
P/2026/01170/DET Granted
Former Bbc Television Centre Wood Lane, London
Details to discharge Condition 58 ( Car Parking Management Plan ) for Plot E & G1, of planning permission (ref. 2016/04585/VAR) dated 22 August 2017.
-
P/2026/01913/DET Awaiting decision
11 Farm Lane, London, SW6 1PU
Submission of details of the installation/commissioning reports of the Zero Emission MCS certified Air Source Heat Pumps to be provided for space heating and hot water for the thirty-one self-contained residential units, pursuant to Condition 18 of planning permission reference: 2022/03329/FR3 dated 19th July 2023.
-
P/2026/01912/DET Awaiting decision
43 Brook Green, London, W6 7EF
Submission of details of a post construction BREEAM assessment pursuant to condition 35 of planning permission ref: 2022/00949/FUL granted 13th July 2023.
-
P/2026/01906/DET Awaiting decision
156 Munster Road, London, SW6 5RA
Submission of details of details of the following external facing materials (including manufacturer's specifications, photographs) pursuant to condition 3; preliminary risk assessment report pursuant to condition 10; site investigation scheme pursuant to condition 11; quantitative risk assessment report pursuant to condition 12; remediation method statement pursuant to condition 13; verification report pursuant to condition 14; onward long-term monitoring methodology report pursuant to condition 15; enhanced sound insulation value DnT,w + Ctr L'nT,w of at least 10dB above the Building Regulations value, for the floor/ceil-ing /wall structures separating different types of rooms/ uses in adjoining dwellings, namely [eg. living room and kitchen above bedroom of separate dwelling] pursuant to condition 16; sound insulation of the floor/ ceiling/walls separating the commercial parts of the premises from dwellings pursuant to condition 17; detailed Demolition and Construction Logistics Plan... read more