Skip to content
PlanIndex Get alerts
Menu

Planning application

2025/03560/FUL

144 Sinclair Road, London, W14 0NL

Awaiting decision Hammersmith and Fulham Full Planning Application

Proposal

De-conversion of the existing building from 3no self-contained flats into a single family dwellinghouse; erection of an additional floor at roof level, formation of a roof terrace and erection of glazed staircase enclosure, installation of 3no air conditioning units, 2no air source heat pumps with acoustic enclosure above the roof of third floor extension; replacement of the existing French doors with new doors at ground floor level and replacement of the existing window with French doors at basement level to the rear elevation; replacement of all remaining existing windows with new windows.

As published by the council, reference 2025/03560/FUL

Timeline

Dates from the published record

  1. 23 Dec 2025

    Received by Hammersmith and Fulham

  2. 10 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Hammersmith and Fulham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P/2026/01556/TREE Awaiting decision

    103 Flat A Basement And Ground Floor,Sinclair Road,London,Hammersmith And Fulham,W14 0NP

    T1 Tree of heaven - REAR GARDEN - To crown reduce by approximately 3 to 4 meters from the branch tips

    16 Jun 2026 52m away Trees
  • 2025/03061/TREE Awaiting decision

    119 Sinclair Road, London, W14 0NP

    T1 - Magnolia grandiflora - Rear Garden - Selectively reduce height and spread by 4m, pruning out the longer sections of the stems, leaving long and natural secondary branches to create a natural appearance - Remove dead branches throughout the crown area that are over 2.5cm in diameter, and inspect the crown for any adversities - The tree's current height is 12m, and its crown spread is 9m - After the proposed works, the tree's height is 8m and the crown spread is 5m

    3 Nov 2025 54m away Trees
  • 2025/02618/TREE Awaiting decision

    121 Sinclair Road, London, W14 0NP

    LHS REAR corner T1-Elder(Sambucus nigra) -light reduction to shape and tidy -remove all deadwood RHS REAR boundary-leaning inbound to garden Elder(Sambucus nigra) -reduce crown by 25%(1m) to suitable growth points -reduce dense crown section by 15% to allow more light/air through canopy -remove all deadwood All works are for routine maintenance.

    25 Sep 2025 60m away Trees
  • PP/22/06743 Withdrawn

    Flat A and B, 56 Elsham Road, London, W14 8HD

    Erection of a garden studio / outbuilding at end of garden***WITHDRAWN***

    7 Nov 2022 81m away Full applications
  • PP/26/01408 Granted

    Flat A, 69 Elsham Road, London, W14 8HD

    Erection of a replacement shed together with erection of a detached outbuilding to be used as a home gym/office.

    31 Jan 2026 81m away Full applications
  • ARB/25/06241 Refused

    62A Elsham Road, London, W14 8HD

    Felling of T1 Holm Oak (Quercus ilex), located in rear garden

    15 Oct 2025 84m away

In Hammersmith and Fulham

  • P/2026/01929/FUL Awaiting decision

    Peabody Estate Blocks J-R Fulham Palace Road London W6 9QQ

    Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.

    29 Jul 2026 Full applications
  • 770 Fulham Road, London, SW6 5SJ

    Erection of a 1.7 metre high obscured glazed screen around part of the flat roof of the existing single storey rear extension, in connection with the creation of a roof terrace.

    1 Jun 2026 Full applications
  • 2025/01323/FUL Refused

    Pavement Adjacent To 1 Hammersmith Broadway London W6 9DL

    Installation of a "Pulse Smart Hub" consisting of a free-standing structure featuring a fully accessible interactive tablet along with integrated digital display screens on two sides and emergency functionality including provision of defibrillators.

    13 May 2025 Full applications
  • P/2026/01915/FUL Awaiting decision

    Peabody Estate, Block S, T And U Fulham Palace Road London W6 9QY

    Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.

    27 Jul 2026 Full applications
  • P/2026/01907/FUL Awaiting decision

    47, Kings Court Hamlet Gardens, London, W6 0RN

    Replacement of 3no. existing single glazed Crittall steel windows with new double glazed Crittall steel windows, to the side elevation at second floor level (Flat 47).

    26 Jul 2026 Full applications