2025/03445/DET

100 Lillie Road, London, SW6 7SR

Refused Hammersmith and Fulham Details to Meet Conditions Full/Outline

Proposal

Submission of details pursuant to Condition 4 (Hard and Soft Landscaping), Condition 11 (Solar PV Panels and GSHPs) and Condition 13 (Sustainable Drainage) of planning permission ref: 2024/00747/FUL granted 6th March 2025.

As published by the council, reference 2025/03445/DET

Timeline

Dates from the published record

  1. 10 Dec 2025

    Received by Hammersmith and Fulham

  2. 15 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 4 Feb 2026

    Decision issued: REFUSE

  4. 24 Jul 2026

    Added to PlanIndex

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 2025/03447/DET Awaiting decision

    100 Lillie Road, London, SW6 7SR

    Submission of details pursuant to Condition 26 (Preliminary Risk Assessment), Condition 27 (Site Investigation Scheme), Condition 28 (Quantitative Risk Assessment), Condition 29 (Remediation Method Statement), Condition 30 (Verification Report) and Condition 31 (Onward Long-Term Monitoring Methodology) of planning permission ref: 2024/00747/FUL granted 6th March 2025.

    10 Dec 2025 0m away Conditions
  • 2025/03446/DET Awaiting decision

    100 Lillie Road, London, SW6 7SR

    Submission of details pursuant to Condition 5 (Secured by Design), Condition 15 (Demolition Management/Logistics Plan), Condition 16 (Construction Management/Logistics Plan), Condition17 (Demolition Air Quality Dust Management Plan), Condition 18 (Construction Air Quality Dust Management Plan); Condition 20 (Ventilation Strategy) of planning permission ref: 2024/00747/FUL granted 6th March 2025.

    10 Dec 2025 0m away Conditions
  • 2026/00250/VAR Granted

    100 Lillie Road, London, SW6 7SR

    Variation of condition 2 of planning permission ref: 2024/00747/FUL granted 6th March 2025 for the 'Demolition of existing light industrial buildings (Class E), redevelopment of the site to include the erection of part single, part two and part two and a half storey buildings to provide 8No. single family dwellinghouses (Class C3) together with roof terraces and solar panels, installation of entrance gates facing Lillie Road, formation of bin stores, cycle stores with bike racks, and associated landscaping' to allow amendments to the approved drawings to include: alterations to the design of rooflights, solar panels, doors and windows in the eastern and western elevations.

    30 Jan 2026 0m away Amendments
  • 2025/01007/FUL Awaiting decision

    99 Lillie Road, London, SW6 7SX

    Demolition and re-building of the second floor level with a new front extension, sliding doors and roof terrace to the rear elevation and erection of an additional floor at roof level together with a roof terrace at third floor level to the front elevation; replacement of existing windows with new windows at first floor level to the front and rear elevations; replacement of the existing ground floor shopfront doors and windows; and conversion of the first, second and third floor level into 2 x 2 bedroom self-contained flats.

    5 Apr 2025 35m away Full applications
  • 2025/00803/FUL Awaiting decision

    230 - 236 North End Road London W14 9NU And 88 - 90 Lillie Road London SW6 7SR

    Replacement of existing garage with 3-storey Apartment building fronting Bramber Road (Apartments 1 and 2); Creation of a new mansard roof extension to form third floor level and partial demolition, conversion and extension of upper floors from vacant offices and 4 Apartments (known as Apartments 230a, 232a, 234a and 5a) to provide 13 Apartments (Apartments 3-15); Demolition of the existing ground floor warehouse, 1st floor apartment at the rear courtyard area and creation of 4 new Apartments comprising ground and first floor plus basement (Apartments 16, 17, 18 and 19); Retention of the existing Turkish Barber retail unit 1 (72.4 sqm), the Jazz Bar (183.42 sqm) and the Gate of Yemen restaurant (110.3sqm) at basement and ground floor levels; 8.08 sqm extension of Jazz Bar to provide a new kitchen extension and new extract system; The addition of 35.89 sqm restaurant and storage area to Gate of Yemen Restaurant taken from the existing No.236a unit and repositioning of the existing exter... read more

    19 Mar 2025 43m away Full applications
  • 2025/02024/FUL Awaiting decision

    246 North End Road, London, SW6 1NL

    Erection of an additional floor at roof level in connection with the creation of 1 x 1 bedroom self-contained flat.

    22 Jul 2025 48m away Full applications

In Hammersmith and Fulham

  • P/2026/01938/DET Awaiting decision

    421 A North End Road,London,Hammersmith And Fulham,SW6 1NY

    Submission of details of full postal address pursuant to condition 9; parking permit scheme pursuant to condition 11; water efficient appliances pursuant to condition 13; mechanical ventilation system pursuant to condition 14; Ultra Low Nox Gas fired boilers to be provided for space heating and domestic hot water pursuant to condition 15; construction logistics plan pursuant to condition 17 of planning permission ref: 2017/03185/FUL granted 19th October 2017.

    29 Jul 2026 Conditions
  • Former Bbc Television Centre Wood Lane, London

    Details to discharge Condition 58 ( Car Parking Management Plan ) for Plot E & G1, of planning permission (ref. 2016/04585/VAR) dated 22 August 2017.

    30 Apr 2026 Conditions
  • P/2026/01913/DET Awaiting decision

    11 Farm Lane, London, SW6 1PU

    Submission of details of the installation/commissioning reports of the Zero Emission MCS certified Air Source Heat Pumps to be provided for space heating and hot water for the thirty-one self-contained residential units, pursuant to Condition 18 of planning permission reference: 2022/03329/FR3 dated 19th July 2023.

    27 Jul 2026 Conditions
  • P/2026/01912/DET Awaiting decision

    43 Brook Green, London, W6 7EF

    Submission of details of a post construction BREEAM assessment pursuant to condition 35 of planning permission ref: 2022/00949/FUL granted 13th July 2023.

    27 Jul 2026 Conditions
  • P/2026/01906/DET Awaiting decision

    156 Munster Road, London, SW6 5RA

    Submission of details of details of the following external facing materials (including manufacturer's specifications, photographs) pursuant to condition 3; preliminary risk assessment report pursuant to condition 10; site investigation scheme pursuant to condition 11; quantitative risk assessment report pursuant to condition 12; remediation method statement pursuant to condition 13; verification report pursuant to condition 14; onward long-term monitoring methodology report pursuant to condition 15; enhanced sound insulation value DnT,w + Ctr L'nT,w of at least 10dB above the Building Regulations value, for the floor/ceil-ing /wall structures separating different types of rooms/ uses in adjoining dwellings, namely [eg. living room and kitchen above bedroom of separate dwelling] pursuant to condition 16; sound insulation of the floor/ ceiling/walls separating the commercial parts of the premises from dwellings pursuant to condition 17; detailed Demolition and Construction Logistics Plan... read more

    25 Jul 2026 Conditions