Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat Ground Floor, 51 Agate Road, London, W6 0AL

Granted Hammersmith and Fulham 2025/02355/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey rear extension, to the side and rear of the existing back addition.

As published by the council, reference 2025/02355/FUL

Application record

Reference
2025/02355/FUL
Type
Full Planning Application
Status
Decided: APPLICATION APPROVED
Decision
APPLICATION APPROVED
Received
30 Aug 2025
Validated
3 Sep 2025
Decided
27 Nov 2025
Ward
Grove
Postcode
W6 0AL

Timeline

Dates from the published record

  1. 30 Aug 2025

    Received by Hammersmith and Fulham

  2. 3 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 27 Nov 2025

    Decision issued: APPLICATION APPROVED

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 59 Agate Road London W6 0AL

    2002/02788/FUL Submitted 12 Nov 2002 6m away

    Excavation of part of the front garden to form a lightwell in connection with the enlargement of the basement.

    Granted Full applications
  • 59 Agate Road London W6 0AL

    2002/02924/TREE Submitted 11 Nov 2002 6m away

    Front garden. Fell Tree.

    Granted Trees
  • 59 Agate Road London W6 0AL

    2002/01929/FUL Submitted 5 Aug 2002 6m away

    Erection of a dormer window on the existing rear roof slope.

    Granted Full applications Loft or dormer Windows or glazing
  • 59 Agate Road London W6 0AL

    2002/01829/CLP Submitted 26 Jul 2002 6m away

    Erection of a single storey rear extension.

    Granted Lawful development Extension
    Small domestic
  • 51 Agate Road London W6 0AL

    2011/03500/CAC Submitted 25 Oct 2011 6m away

    To make existing opening wider for access.

    Decided Heritage and listed buildings
  • 33 Agate Road London W6 0AL

    2007/03596/TREE Submitted 13 Sep 2007 6m away

    Front: Sycamore- fell to ground level

    Decided Trees

In Hammersmith and Fulham

  • 44 Flat B,Studland Street,London,Hammersmith And Fulham,W6 0JS

    Replacement of all existing timber framed windows at first floor level with new double glazed timber framed windows. Replacement of existing rooflight to the roof of the rear back addition.

    24 Apr 2026 Full applications
  • 59A Chesson Road, London, W14 9QT

    Erection of an additional floor at roof level.

    24 Jun 2026 Full applications
  • P/2026/01493/HH Granted

    Flat C Top Floor, 1 Hartismere Road, London, SW6 7TS

    Erection of a rear extension at second floor level, on top of the existing two storey back addition.

    10 Jun 2026 Full applications
  • 2025/03373/FUL Granted

    51 Percy Road, London, W12 9PX

    Erection of a rear roof extension; erection of a rear extension at second floor level, over remaining part of existing back addition; erection of a 1.7 metre high opaque glazed screen around the flat roof at third floor level of the existing back addition and proposed second floor rear extension, in connection with its use as a roof terrace; installation of a dormer to house a door replacing the existing window to the rear elevation at third floor level, to provide access to the proposed roof terrace; installation of window to the side elevation at second floor level; and installation of 2no. rooflights in the front roofslope.

    4 Dec 2025 Full applications
  • P/2026/02202/FUL Awaiting decision

    5 Raynham Road, London, W6 0HY

    Demolition and re-building of existing conservatory comprising of timber framed structure and new glazing.

    24 Aug 2026 Full applications