Skip to content
PlanIndex Get alerts
Menu

Planning application

2024/03242/FUL

356 King Street, London, W6 0RX

Awaiting decision Hammersmith and Fulham Full Planning Application

Proposal

Erection of a rear roof extension; erection of a rear extension at third floor level, over part of the existing back addition; erection of a two storey rear extension at first and second floor level, over part of the existing ground floor extension; installation of 2no. rooflights in the front roofslope; conversion of 2no. existing three bedroom self-contained flats at first and second floor level into 3no. self-contained flats, consisting of a two bedroom flat at first floor level, a two bedroom flat at second floor level and a one bedroom flat at third floor level.

As published by the council, reference 2024/03242/FUL

Timeline

Dates from the published record

  1. 20 Dec 2024

    Received by Hammersmith and Fulham

  2. 9 Jan 2025

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Hammersmith and Fulham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2002/01797/FUL Decided

    372 King Street London W6 0RX

    Conversion of the first and second floors from one maisonette to one self-contained flat and one self-contained studio flat.

    24 Jul 2002 2m away Full applications
  • 2001/01807/CLE Granted

    360 King Street London W6 0RX

    Continued use of the premises as a car hire office.

    16 Nov 2001 2m away Lawful development
  • 2001/03009/TREE Granted

    350 King Street London W6 0RX

    Ash (Office Courtyard) Fell & remove

    15 Nov 2001 2m away Trees
  • 2001/01399/FUL Refused

    372 King Street London W6 0RX

    Conversion of the first and second floors to two self contained flats; erection of a glazed extension at second level at the front of the property.

    13 Jul 2001 2m away Full applications
  • 2020/00632/TREE Awaiting decision

    350 King Street London W6 0RX

    Front Garden/Frontage: 1. Gleditsia. Re-reduce to previous reduction points to leave a 'frame-work' 'pollard'.

    2 Mar 2020 2m away Trees
  • 2018/00706/PD56 Awaiting decision

    358 King Street London W6 0RX

    Change of use of the ground floor from use class A1/A2 (retail/financial and professional services) into use class D2 (leisure).

    28 Feb 2018 2m away Prior approval

In Hammersmith and Fulham

  • P/2026/01929/FUL Awaiting decision

    Peabody Estate Blocks J-R Fulham Palace Road London W6 9QQ

    Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.

    29 Jul 2026 Full applications
  • 770 Fulham Road, London, SW6 5SJ

    Erection of a 1.7 metre high obscured glazed screen around part of the flat roof of the existing single storey rear extension, in connection with the creation of a roof terrace.

    1 Jun 2026 Full applications
  • 2025/01323/FUL Refused

    Pavement Adjacent To 1 Hammersmith Broadway London W6 9DL

    Installation of a "Pulse Smart Hub" consisting of a free-standing structure featuring a fully accessible interactive tablet along with integrated digital display screens on two sides and emergency functionality including provision of defibrillators.

    13 May 2025 Full applications
  • P/2026/01915/FUL Awaiting decision

    Peabody Estate, Block S, T And U Fulham Palace Road London W6 9QY

    Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.

    27 Jul 2026 Full applications
  • P/2026/01907/FUL Awaiting decision

    47, Kings Court Hamlet Gardens, London, W6 0RN

    Replacement of 3no. existing single glazed Crittall steel windows with new double glazed Crittall steel windows, to the side elevation at second floor level (Flat 47).

    26 Jul 2026 Full applications