Skip to content
PlanIndex Get alerts
Menu

Planning application

50 Tabor Road, London, W6 0BW

Granted Hammersmith and Fulham 2021/00439/FUL Full Planning Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement lower ground floor extension to the side and rear of the existing back addition; and erection of a bike and bin store in the front garden.

As published by the council, reference 2021/00439/FUL

Application record

Reference
2021/00439/FUL
Type
Full Planning Application
Status
Decided: APPLICATION APPROVED
Decision
APPLICATION APPROVED
Received
10 Feb 2021
Validated
15 Feb 2021
Decided
16 Jun 2021
Ward
Hammersmith Broadway
Postcode
W6 0BW

Timeline

Dates from the published record

  1. 10 Feb 2021

    Received by Hammersmith and Fulham

  2. 15 Feb 2021

    Validated

    Checked as complete and ready for consideration.

  3. 16 Jun 2021

    Decision issued: APPLICATION APPROVED

  4. 15 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21 Iffley Road, London, W6 0PB

    2025/02491/TREE Submitted 15 Sep 2025 21m away

    96% historically approved · decision due ~11 Nov

    Salix Caprea (Goat willow), rear garden - remove in it's entirety - water-seeking roots can damage foundations, invade and block drains, and interfere with underground pipes

    Awaiting decision Trees 3 docs
  • 21 Iffley Road, London, W6 0PB

    2025/01219/DET Submitted 29 Apr 2025 21m away

    Submission of details of Construction Logistics Plan pursuant to condition 7 of planning permission ref: 2024/03023/FUL granted 17th April 2025.

    Withdrawn Conditions 3 docs
  • 49 Tabor Road, London, W6 0BN

    2025/03293/TREE Submitted 25 Nov 2025 32m away

    96% historically approved · decision due ~21 Jan

    T1-Olive (Oleo europaea)-reduce crown by 25%(1.3m) to suitable growth points -reduce lateral spread to match ensuring good separation from building-thin crown by 15% to allow more light/air through canopy

    Awaiting decision Trees 3 docs
  • 47 Tabor Road London W6 0BN

    2021/00212/FUL Submitted 22 Jan 2021 34m away

    97% historically approved · decision due ~22 Mar

    Erection of a rear roof extension, involving an increase in the ridge height by 380mm; erection of a rear extension at second floor level over part of the existing back addition; and installation of 3no. rooflights on front roofslope.

    Awaiting decision Full applications Extension Loft or dormer +1 11 docs
  • 4 Tabor Road London W6 0BW

    2019/03522/TREE Submitted 26 Nov 2019 42m away

    96% historically approved · decision due ~22 Jan

    (T1) - Golden Rain Tree(Koelrutera paniculata)-severe decline with ganoderma brackets DBH65cm Section fell to ground level.Tree is in severe decline due to being infected with Ganoderma brackets.

    Awaiting decision Trees 2 docs
  • 4 Tabor Road London W6 0BW

    2019/03498/TREE Submitted 25 Nov 2019 42m away

    96% historically approved · decision due ~21 Jan

    Golden Rain Tree-in severe cause due to ganoderma bracket fungus infectionSection fell to ground levelGrind out stump

    Awaiting decision Trees 2 docs

In Hammersmith and Fulham

  • 44 Flat B,Studland Street,London,Hammersmith And Fulham,W6 0JS

    Replacement of all existing timber framed windows at first floor level with new double glazed timber framed windows. Replacement of existing rooflight to the roof of the rear back addition.

    24 Apr 2026 Full applications
  • 59A Chesson Road, London, W14 9QT

    Erection of an additional floor at roof level.

    24 Jun 2026 Full applications
  • P/2026/01493/HH Granted

    Flat C Top Floor, 1 Hartismere Road, London, SW6 7TS

    Erection of a rear extension at second floor level, on top of the existing two storey back addition.

    10 Jun 2026 Full applications
  • 2025/03373/FUL Granted

    51 Percy Road, London, W12 9PX

    Erection of a rear roof extension; erection of a rear extension at second floor level, over remaining part of existing back addition; erection of a 1.7 metre high opaque glazed screen around the flat roof at third floor level of the existing back addition and proposed second floor rear extension, in connection with its use as a roof terrace; installation of a dormer to house a door replacing the existing window to the rear elevation at third floor level, to provide access to the proposed roof terrace; installation of window to the side elevation at second floor level; and installation of 2no. rooflights in the front roofslope.

    4 Dec 2025 Full applications
  • P/2026/02202/FUL Awaiting decision

    5 Raynham Road, London, W6 0HY

    Demolition and re-building of existing conservatory comprising of timber framed structure and new glazing.

    24 Aug 2026 Full applications