Planning application
12 Ellerby Street London SW6 6EY
Works: Extension Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a rear roof extension, including French doors and a Juliette balcony; erection of a rear extension at second floor level, over part of the existing back addition; and erection of a single storey rear extension, to the side and rear of the existing back addition.
As published by the council, reference 2020/03125/FUL
Application record
- Reference
- 2020/03125/FUL
- Type
- Full Detailed Planning Application
- Status
- Application Approved
- Decision
- Application Approved
- Received
- 26 Nov 2020
- Validated
- 21 Dec 2020
- Decided
- 2 Feb 2021
- Ward
- Palace Riverside
- Decision by
- Delegated Decision
- Postcode
- SW6 6EY
Timeline
Dates from the published record
-
26 Nov 2020
Received by Hammersmith and Fulham
-
21 Dec 2020
Validated
Checked as complete and ready for consideration.
-
2 Feb 2021
Decision issued: Application Approved
-
15 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Shoreham-By-Sea
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
40 Ellerby Street London SW6 6EY
97% historically approved · decision due ~17 Dec
T1 Magnolia grandiflora - Crown Reduction - Reducing the height and spread of the tree by up to 0.5m Final height 6m and spread 2m. To tidy and contain; T2 Viburnum (Viburnum tinus) - Trim all aspect to create a neat 'ball' shape
Awaiting decision Trees 2 docs -
20 Ellerby Street, London, SW6 6EY
98% historically approved · decision due ~20 Oct
Erection of a single storey rear extension, to the side and rear of the existing back addition; excavation of the front and rear gardens to form a front lightwell in connection with the enlargement of the existing basement; erection of 3no dormer windows to replace the existing windows in the front roofslope; infilling of 1no existing rooflight, installation of 2no new rooflights and 2no air conditioning units above the main flat roof at roof level; replacement of 1no existing window with a new enlarged window to the side of rear back addition and installation of 1no new window opening to the side of main building at first floor level; installation of 2no new window opening and 1no new door opening to the side of main building at ground floor level.
Awaiting decision Householder Extension Loft or dormer +1 24 docsSmall domestic -
20 Ellerby Street, London, SW6 6EY
Submission of details of a Construction Logistics Plan, pursuant to Condition 7 of planning permission reference: 2025/00428/FUL dated 7th May 2025.
Granted Conditions 4 docs -
22 Ellerby Street, London, SW6 6EY
Submission of details of a Construction Logistics Plan, pursuant to Condition 7 of the planning permission reference: 2024/03276/FUL dated 19th June 2025.
Granted Conditions 5 docs -
22 Ellerby Street, London, SW6 6EY
98% historically approved · decision due ~11 Aug
Erection of a rear extension at second floor level, over part of the existing back addition; erection of a single storey rear extension, to the side and rear of the existing back addition; installation of 2no. air conditioning units and rooflights, on top of the main flat roof at roof level; excavation of the front and part of the rear garden to form lightwells, in connection with the enlargement of the existing basement.
Awaiting decision Householder Extension Loft or dormer 33 docsSmall domestic -
1, 3, 5 And 7 Finlay Street London SW6 6HE
Erection of front roof extensions to property nos. 1, 3, 5 and 7 Finlay Street; installation of new sliding doors to replace the existing French doors at ground floor level to the rear elevation at No 7 Finlay Street.
Granted Full applications Extension Windows or glazing 9 docs
Other full applications applications
In Hammersmith and Fulham
-
P/2026/01173/FUL Granted
343 Fulham Palace Road, London, SW6 6TD
Installation of a new structure with door opening and the erection of obscure glazed screen around part of the flat roof at third floor level to the rear elevation in connection with its use as a terrace.
-
P/2026/01729/FR3 Granted
24-26 Matheson Road, London, W14 8SW
Replacement of existing vehicular entrance gates with new vehicular entrance gates and railings in between building no. 24-26 Matheson Road and no. 32 Matheson Road; installation of a pedestrian entrance gate in between building no. 24-26 Matheson Road and no. 22 Matheson Road.
-
P/2026/01645/FUL Granted
10 Cathnor Road, London, W12 9JA
Replacement of existing single glazed timber framed sash windows to the front elevation with double glazed timber framed sash windows and the existing single glazed rear elevations with new double glazed timber sash windows; and replacement of existing single glazed timber framed basement entrance door to the rear elevation with a new double glazed composite GRP door.
-
P/2026/01106/FUL Granted
44 Flat B,Studland Street,London,Hammersmith And Fulham,W6 0JS
Replacement of all existing timber framed windows at first floor level with new double glazed timber framed windows. Replacement of existing rooflight to the roof of the rear back addition.
-
P/2026/01614/FUL Granted
59A Chesson Road, London, W14 9QT
Erection of an additional floor at roof level.