Planning application
196 Dalling Road London W6 0ER
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of conditions 2 and 4, removal of conditions 8, 9, 10, 11, 15, 17, 18, 19, 20, 21, 22 and 23 to allow the omission of the basement extension of planning permission ref: 2018/02577/FUL granted 3rd October 2018.
As published by the council, reference 2019/01529/VAR
Application record
- Reference
- 2019/01529/VAR
- Type
- Vary or Delete Conditions Full/Outline
- Status
- Application Approved
- Decision
- Application Approved
- Received
- 20 May 2019
- Validated
- 20 May 2019
- Decided
- 23 Jul 2019
- Ward
- Ravenscourt Park
- Decision by
- Delegated Decision
- Postcode
- W6 0ER
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 3 applications since 2019: 1 approved, 0 refused.
-
2020/03446/CLP Awaiting decision
196 Dalling Road London W6 0ER
Retention of 1no rooflight in the front roofslope.
-
2019/02326/TREE Awaiting decision
196 Dalling Road London W6 0ER
Rear garden. Monterey Cypress (T1) - Fell
Timeline
Dates from the published record
-
20 May 2019
Received by Hammersmith and Fulham
-
23 Jul 2019
Decision issued: Application Approved
-
11 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Howard Sharp and Partners LLP Agent
16 applications on PlanIndex · across 13 councils · 85% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
26 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Hammersmith and Fulham granted permission on 23 July 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
196 Dalling Road London W6 0ER
90% historically approved · decision due ~24 Feb
Retention of 1no rooflight in the front roofslope.
Awaiting decision Lawful development Loft or dormer 25 docs -
Maisonette First And Second Floors, 9 Nasmyth Street, London, W6 0HA
Erection of a rear roof extension involving an increase in the ridge height by 300mm; erection of a rear extension at first floor level on top of the existing back addition; installation of 3no rooflights in the front roofslope, 1no rooflight above the main flat roof at roof level and 2no rooflights above the roof of the first floor rear back addition; replacement of existing windows with new windows to rear and side elevations at upper ground floor level; replacement of existing sash windows to front and rear elevation with double glazed timber framed sash windows.
Granted Full applications Extension Loft or dormer +2 23 docs -
185 Dalling Road, London, W6 0ES
97% historically approved · decision due ~4 Jul
T1 False Acacia - Crown reduction by up to 4.5 meters to shape and contain. Final height 6.5 meters and final spread 4 meters.
Awaiting decision Trees 6 docs -
21 Nasmyth Street, London, W6 0HA
Repair and redecoration of the existing windows and external facade to the front elevation at first floor level; replacement of existing roof tiles with new artificial slate tiles to the main rear roofslope, and to the pitched roof of two storey back addition.
Granted Full applications Roofing Windows or glazing 13 docs -
167 Dalling Road London W6 0ES
97% historically approved · decision due ~16 Mar
T1 Lime (front): Reduce/ repollard crown to last points of reduction. Ensure no growth is retained.T2 Sycamore (rear): Reduce/ repollard crown to last points of reduction. Ensure no growth is retained
Awaiting decision Trees 3 docs -
157 Dalling Road London W6 0ES
97% historically approved · decision due ~16 Mar
T1 - Magnolia - Front - Reduce crown by approx. 2.5 - 3m. Thin crown by approx. 10%
Awaiting decision Trees 3 docs
Other condition discharge and variation applications
In Hammersmith and Fulham
-
P/2026/01716/DET Granted
3 Shortlands, London, W6 8DA
Submission of details of demolition and construction workforce travel plan pursuant to condition 41 of planning permission ref: 2025/01723/FUL granted 1st July 2026.
-
P/2026/02370/DET Awaiting decision
M&S White City Site 54 Wood Lane London W12 7RQ
Discharge of Condition 80 (Energy Plant Air Quality Assessment); Condition 81 (CHP and boiler NOx emissions) of Planning Permission (ref: 2023/01965/VAR) dated 21 August 2024.
-
P/2026/01758/DET Granted
3 Shortlands, London, W6 8DA
Submission of details of hard and soft landscaping of all areas external to the building, detailed drawings at a scale of not less than 1:20 to include all planting and paving, seating, fences, gates and other means of enclosure pursuant to condition 46 of planning permission ref: 2025/01723/FUL granted 1st July 2026.
-
P/2026/02360/DET Awaiting decision
Land at the former Hartopp point and Lannoy Point Aintree Estate, Pellant Road London SW6 7NG
Details to discharge Condition 48 (Secure by Design) of planning permission (ref: 2022/01346/FR3) dated 9 February 2023 as amended by 2025/03564/NMAT dated 2 February 2026.
-
P/2026/01713/DET Granted
3 Shortlands, London, W6 8DA
Submission of details of construction logistics plan pursuant to condition 5 of planning permission ref: 2025/01723/FUL granted 1st July 2026.