Planning application
213 Askew Road London W12 9AZ
Works: Extension Loft or dormer Roofing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a rear roof extension including the formation of a hip to gable roof extension involving an increase in the ridge height.
As published by the council, reference 2019/00034/FUL
Application record
- Reference
- 2019/00034/FUL
- Type
- Full Detailed Planning Application
- Status
- Application Approved
- Decision
- Granted As published: Application Approved
- Received
- 11 Jan 2019
- Validated
- 11 Jan 2019
- Decided
- 1 Apr 2019
- Ward
- Askew
- Decision by
- Delegated Decision
- Postcode
- W12 9AZ
Timeline
Dates from the published record
-
11 Jan 2019
Received by Hammersmith and Fulham
-
1 Apr 2019
Decision issued: Application Approved
-
21 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Patrick Allen Associates Agent
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Hammersmith and Fulham granted permission on 1 April 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
211 Askew Road, London, W12 9AZ
97% historically approved · decision due ~11 Jul
(T1) - Lime (Tilia cordata) - rear garden - re-pollard to main single stem pollard point
Awaiting decision Trees 4 docs -
The Eagle, 215 Askew Road, London, W12 9AZ
Display of an externally illuminated fascia lettering sign; display of an externally illuminated double-sided hanging sign; and display of a non-illuminated entrance plaque to the front elevation.
Granted Advertising 21 docs -
The Eagle, 215 Askew Road, London, W12 9AZ
Erection of black metal railings enclosing the front garden area; installation of new tiling and redecoration to the front elevation; and installation of new lighting.
Granted Full applications 15 docs -
1 King's Parade Askew Road London W12 9BA
98% historically approved · decision due ~2 Jun
Installation of a new aluminium framed shopfront to replace existing aluminium shopfront including installation of a retractable canopy above the front entrance.
Awaiting decision Full applications Windows or glazing 22 docs -
1 King's Parade Askew Road London W12 9BA
93% historically approved · decision due ~3 Feb
Display of an internally illuminated fascia sign; display of an internally illuminated projecting sign.
Awaiting decision Advertising 16 docs -
6 King's Parade Askew Road London W12 9BA
Retention of an existing internally illuminated LED fascia sign and an internally illuminated LED projecting sign. (revised description).
Refused Advertising 17 docs
Other full applications
In Hammersmith and Fulham
-
2025/02611/FUL Granted
30 Galloway Road, London, W12 0PJ
Replacement of all existing single glazed timber windows with new double glazed timber windows; replacement of existing timber moulded door and single glazed obscured panels and toplight with a new timber moulded door and double glazed obscured panels and toplight to the front elevation, and replacement of existing single glazed timber door and single glazed sidelight and toplight with a new double glazed timber door and double glazed sidelight and toplight to the rear elevation at ground floor level.
-
2025/02608/FUL Granted
26 Galloway Road, London, W12 0PJ
Replacement of all existing single glazed timber windows with new double glazed timber windows; replacement of existing single glazed timber moulded door including single glazed obscured toplights with a new double glazed timber moulded door including double glazed obscured toplights to the front elevation, and replacement of existing single glazed timber door including single glazed sidelight and toplight with a new double glazed timber door including double glazed sidelight and toplight to the rear elevation at ground floor level.
-
2025/02610/FUL Granted
29 Galloway Road, London, W12 0PH
Replacement of existing single glazed uPVC windows with new double glazed timber windows to the front elevation; replacement of existing composite moulded door and double glazed obscured toplight with a new traditional timber moulded door and double glazed obscured toplight to the front elevation at ground floor level; replacement of existing single glazed timber windows with new double glazed timber windows to the rear elevation; and replacement of existing single glazed timber French door and single glazed panels with a new double glazed timber French door and double glazed panels to the rear elevation at ground floor level.
-
P/2026/02334/FUL Awaiting decision
169-175 Nazareth House, Hammersmith Road, London, W6 8DB
Erection of 3no bollards, replacement of 1no window with a door and formation of an access ramp with handrails, installation of dropped kerb and formation of zebra crossing to eastern elevation of the building.
-
2026/00056/FUL Granted
Chiswick Nursing Centre Ravenscourt Gardens, London, W6 0AE
Replacement of existing windows and doors with new double glazed Aluminium windows and doors.