Skip to content
PlanIndex Get alerts
Menu

Planning application

55 Anselm Road London SW6 1LH

Granted Hammersmith and Fulham 2018/03342/FUL Full Detailed Planning Application

Works: Extension Loft or dormer Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey rear extension, to the side and rear of the existing back addition following the demolition of existing shed and alterations to the roof of single storey back addition; replacement of existing front entrance door with a new panelled door; installation of 2no rooflights to the side roofslopes of the main roof.

As published by the council, reference 2018/03342/FUL

Application record

Reference
2018/03342/FUL
Type
Full Detailed Planning Application
Status
Application Approved
Decision
Granted As published: Application Approved
Received
15 Oct 2018
Validated
15 Oct 2018
Decided
10 Dec 2018
Ward
Fulham Broadway
Decision by
Delegated Decision
Postcode
SW6 1LH

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 2 applications since 2018: 1 approved, 0 refused.

  • 2019/02519/TREE Awaiting decision

    55 Anselm Road London SW6 1LH

    T1: Hazel - Fell tree to a point as close to ground level as is reasonably practicable to leave a stump. Grind stump using mechanical destruction method. Excess arisings will be placed back into the void left by the stump as the ground will settle over time.

    Submitted 23 Aug 2019 Trees

Timeline

Dates from the published record

  1. 15 Oct 2018

    Received by Hammersmith and Fulham

  2. 10 Dec 2018

    Decision issued: Application Approved

  3. 21 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Extension Architecture Agent, an architecture practice registered in Worcester Park

Dissolved · incorporated 2017 · Worcester Park

110 applications on PlanIndex · across 20 councils · 76% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Hammersmith and Fulham granted permission on 10 December 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 86 - 90 Halford Road London SW6 1JX

    2025/02831/FUL Submitted 13 Oct 2025 50 yards away

    Replacement of all existing single glazed timber framed windows with new double glazed timber framed windows to the front elevation, new double glazed uPVC framed windows to the rear elevation and to the side of rear back addition.

    Granted Full applications Windows or glazing
  • 45 Anselm Road London SW6 1LH

    2020/02632/FUL Submitted 13 Oct 2020 50 yards away

    Erection of two side dormer roof extensions, one on each of the existing side roofslopes.

    Granted Full applications Extension Loft or dormer 14 docs
  • Flat Ground Floor 36 Halford Road London SW6 1JT

    2020/02449/FUL Submitted 25 Sep 2020 50 yards away

    98% historically approved · decision due ~14 Dec

    Replacement of all existing timber sash windows to the front elevation and rear elevation of the existing back addition at upper ground floor level with double-glazed uPVC casement windows.

    Awaiting decision Full applications Windows or glazing 15 docs
  • 55 Anselm Road London SW6 1LH

    2019/02519/TREE Submitted 23 Aug 2019 50 yards away

    97% historically approved · decision due ~22 Oct

    T1: Hazel - Fell tree to a point as close to ground level as is reasonably practicable to leave a stump. Grind stump using mechanical destruction method. Excess arisings will be placed back into the void left by the stump as the ground will settle over time.

    Awaiting decision Trees 2 docs
  • 34 Halford Road, London, SW6 1JT

    2025/02836/FUL Submitted 13 Oct 2025 50 yards away

    Replacement of all existing single glazed timber framed windows with new double glazed timber framed windows to the front elevation, new double glazed uPVC framed windows to the rear elevation and to the side of rear back addition.

    Granted Full applications Windows or glazing
  • School House Fulham Primary School Halford Road London SW6 1JU

    2019/03452/FR3 Submitted 20 Nov 2019 50 yards away

    98% historically approved · decision due ~16 Jan

    Change of use from a school caretaker's house (Class D2) to a house of multiple occupation consisting of a 6 bedrooms for use by 6 teachers (Class C4); alterations to the building and curtilage to include installation of a new pedestrian entrance gate on the Halford Road elevation and replacement of an existing window to the front elevation at ground floor level with a new entrance door; bricking up of the existing entrance door to the property from the playground on the east elevation; and landscaping works to the front garden area.

    Awaiting decision Full applications Windows or glazing 18 docs

In Hammersmith and Fulham

  • 2025/02611/FUL Granted

    30 Galloway Road, London, W12 0PJ

    Replacement of all existing single glazed timber windows with new double glazed timber windows; replacement of existing timber moulded door and single glazed obscured panels and toplight with a new timber moulded door and double glazed obscured panels and toplight to the front elevation, and replacement of existing single glazed timber door and single glazed sidelight and toplight with a new double glazed timber door and double glazed sidelight and toplight to the rear elevation at ground floor level.

    Received 24 Sep, published by the council 25 Jul 2026 Full applications
  • 2025/02608/FUL Granted

    26 Galloway Road, London, W12 0PJ

    Replacement of all existing single glazed timber windows with new double glazed timber windows; replacement of existing single glazed timber moulded door including single glazed obscured toplights with a new double glazed timber moulded door including double glazed obscured toplights to the front elevation, and replacement of existing single glazed timber door including single glazed sidelight and toplight with a new double glazed timber door including double glazed sidelight and toplight to the rear elevation at ground floor level.

    Received 24 Sep, published by the council 25 Jul 2026 Full applications
  • 2025/02610/FUL Granted

    29 Galloway Road, London, W12 0PH

    Replacement of existing single glazed uPVC windows with new double glazed timber windows to the front elevation; replacement of existing composite moulded door and double glazed obscured toplight with a new traditional timber moulded door and double glazed obscured toplight to the front elevation at ground floor level; replacement of existing single glazed timber windows with new double glazed timber windows to the rear elevation; and replacement of existing single glazed timber French door and single glazed panels with a new double glazed timber French door and double glazed panels to the rear elevation at ground floor level.

    Received 24 Sep, published by the council 25 Jul 2026 Full applications
  • P/2026/02334/FUL Awaiting decision

    169-175 Nazareth House, Hammersmith Road, London, W6 8DB

    Erection of 3no bollards, replacement of 1no window with a door and formation of an access ramp with handrails, installation of dropped kerb and formation of zebra crossing to eastern elevation of the building.

    Received 9 Sep, published by the council 17 Sep 2026 Full applications
  • 2026/00056/FUL Granted

    Chiswick Nursing Centre Ravenscourt Gardens, London, W6 0AE

    Replacement of existing windows and doors with new double glazed Aluminium windows and doors.

    Received 11 Jan, published by the council 24 Jul 2026 Full applications