Planning application
63 Hestercombe Avenue London SW6 5LL
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of all existing double glazed uPVC casement windows and two timber single glazed doors to front elevation with new timber double glazed sash windows and two new timber double glazed doors; replacement of all existing single glazed timber and casement windows with new uPVC double glazed sash and casement windows to the rear and side elevations; replace existing timber single glazed doors to rear elevation with new uPVC double glazed doors.
As published by the council, reference 2018/02344/FUL
Application record
- Reference
- 2018/02344/FUL
- Type
- Full Detailed Planning Application
- Status
- Application Approved
- Decision
- Granted As published: Application Approved
- Received
- 12 Jul 2018
- Validated
- 12 Jul 2018
- Decided
- 6 Sep 2018
- Ward
- Munster
- Decision by
- Delegated Decision
- Postcode
- SW6 5LL
Timeline
Dates from the published record
-
12 Jul 2018
Received by Hammersmith and Fulham
-
6 Sep 2018
Decision issued: Application Approved
-
25 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
BPG Agent, registered in Dorking
Active · incorporated 1988 · Dorking
28 applications on PlanIndex · across 3 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
12 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Hammersmith and Fulham granted permission on 6 September 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
57 Hestercombe Avenue London SW6 5LL
Erection of a rear extension at second floor level on top of the existing back addition; including relocation of existing French door and juliet balcony and blocking off existing window at the rear roof slope.
Refused Full applications Extension Windows or glazing 33 docs -
63 Munster Road London SW6 5RE
Submission of details of the Ultra Low Nox Gas fired boilers pursuant to Condition 9 of planning permission reference: 2016/05511/FUL dated 1st March 2017.
Granted Conditions 20 docs -
63 Munster Road London SW6 5RE
Submission of details of enhanced sound insulation pursuant to condition 5; sound insulation of the floor/ ceiling/ walls separating the plant room from dwellings pursuant to condition 6; demolition building contract pursuant to condition 7; demolition method statement and a construction/demolition logistics plan pursuant to condition 8; preliminary risk assessment report pursuant to condition 12; site investigation scheme pursuant to condition 13; Non Road Mobile Machinery pursuant to condition 20; partial discharge of condition 14 (quantitative risk assessment report), 15 (remediation method statement), 16 (verification report) and 17 (onward long-term monitoring methodology report) of planning permission ref: 2016/05511/FUL granted 1st March 2017.
Refused Conditions Demolition 22 docs -
63 Munster Road London SW6 5RE
Submission of details of a building contract and notice of demolition in writing pursuant to Condition 7; submission of details of a demolition method statement and a construction/demolition logistics plan pursuant to Condition 8 of planning permission reference: 2016/05511/FUL dated 1st March 2017.
Granted Conditions Demolition 43 docs -
63 Munster Road London SW6 5RE
Submission of details of mechanical ventilation system pursuant to condition 19 of planning permission reference: 2016/05511/FUL granted 1st March 2017.
Withdrawn Conditions 14 docs -
63 Munster Road London SW6 5RE
Submission of details of a quantitative risk assessment report, pursuant to Condition 14 of planning permission reference: 2016/05511/FUL granted 1st March 2017.
Granted Conditions 7 docs
Other full applications
In Hammersmith and Fulham
-
P/2026/02167/FUL Granted
85, 87 And 89 Erconwald Street, London, W12 0BT
Replacement of the existing timber framed windows (comprising of 8no windows) with new double glazed PVCu framed windows to the front elevation of no 85, 87 and 89 Erconwald Street.
-
P/2026/02334/FUL Granted
169-175 Nazareth House, Hammersmith Road, London, W6 8DB
Erection of 3no bollards, replacement of 1no window with a door and formation of an access ramp with handrails, installation of dropped kerb and formation of zebra crossing to eastern elevation of the building.
-
P/2026/02309/FUL Granted
174 King Street, London, W6 0RA
Alterations to the side (east facing) elevation of the building at ground floor level to include the infilling of one existing window opening, the installation of one new door opening, replacement of an existing door and replacement of one window.
-
P/2026/02927/FUL Awaiting decision
474-476 Broadway Bar And Grill, Fulham Road, London, SW6 1BY
Erection of an additional floor at roof level; erection of rear extensions at first, second and third floor levels; excavation and enlargement of the existing basement including lowering the floor level of existing basement area.
-
P/2026/02425/FR3 Granted
58 St Dunstan's Road, London, W6 8RA
Installation of 3no. photovoltaic solar panels to the rear roof slope; replacement of all existing double glazed timber framed windows to the front elevation with new double glazed timber framed windows; replacement of the existing traditional moulded door and single glazed top light window to the front elevation with a traditional moulded door and double glazed top light window; replacement of all existing double glazed uPVC framed windows to the rear and rear side elevations with new double glazed uPVC framed windows; and replacement of existing double glazed uPVC framed door to the rear side elevation with a new double glazed uPVC framed door.