Skip to content
PlanIndex Get alerts
Menu

Planning application

153 Uxbridge Road London W12 9RB

Granted Hammersmith and Fulham 2003/02320/TEL28 Telecommunication Prior Approval 28 day

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Relocation of public payphone.

As published by the council, reference 2003/02320/TEL28

Application record

Reference
2003/02320/TEL28
Type
Telecommunication Prior Approval 28 day
Status
Application Approved
Decision
Application Approved
Received
13 Aug 2003
Validated
13 Aug 2003
Decided
10 Sep 2003
Ward
Askew
Decision by
Delegated Decision
Postcode
W12 9RB

Timeline

Dates from the published record

  1. 13 Aug 2003

    Received by Hammersmith and Fulham

  2. 10 Sep 2003

    Decision issued: Application Approved

  3. 5 Sep 2026

    Added to PlanIndex

What this grant of permission means

Hammersmith and Fulham granted permission on 10 September 2003, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About telecoms applications

Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Flat M 167 - 169 Uxbridge Road London W12 9RB

    2002/02183/FUL Submitted 16 Dec 2002 0m away

    Installation of UPVC windows to replace existing at second floor level.

    Granted Full applications Windows or glazing
  • Bus Shelter Outside 165 Uxbridge Road London W12 0NP

    2024/03158/ADV Submitted 10 Dec 2024 34m away

    93% historically approved · decision due ~7 Feb

    Display of double sided internally illuminated freestanding lcd digital screen panel sign measuring 2100mm (height) x 1340mm (width) to the side elevation of existing bus shelter.

    Awaiting decision Advertising 10 docs
  • Oaklands Court 394 Uxbridge Road London W12 0LD

    2021/00245/TPO Submitted 26 Jan 2021 44m away

    97% historically approved · decision due ~24 Mar

    Pruning of 7no. Lime Trees subject to Tree Preservation Order TPO/103/1/84, by re-pollarding to previous reduction points removing up to 1 - 1.5 metres.

    Awaiting decision Trees 5 docs
  • 1 - 46 Oaklands Court Site Of The Former Oaklands Congregational Church And 392 - 398 Uxbridge Road London W12 0NR

    2020/02022/VAPO Submitted 5 Aug 2020 49m away

    95% historically approved · decision due ~1 Oct

    Variation of the Section 106 Agreement attached to planning permission reference: 2002/02960/FUL dated 23rd May 2003 in amending the mortgagee exclusion clause in clause 5.5 of the Agreement.

    Awaiting decision Conditions 6 docs
  • Oaklands Court, 394 Uxbridge Road, London, W12 0LD

    2025/03314/CLP Submitted 27 Nov 2025 56m away

    Removal of all combustible materials including existing timber cladding, timber decking to the balconies and spandrel panels to the lower portions of some windows, and replacement with visually like-for-like materials that satisfy current building regulations with regards to fire safety.

    Granted Lawful development Windows or glazing
  • The New Surgery, 143A Uxbridge Road, London, W12 9RD

    2025/01622/TREE Submitted 12 Jun 2025 57m away

    T2 - Common Lime (Tilia x europaea) - Reduce crown by around 2m below the most recent previous reduction points, removing approx. 5-6m of new growth. Final height 8m and final overall spread 5m. (See 2025/01580/TPO - T1 Common Lime (Tilia x europaea) - Twin stemmed tree - Reduce crown by around 3m below the most recent reduction points, removing approx. 5-6m of new growth. Final height 13m and final overall spread 6m.)

    Withdrawn Trees 2 docs

In Hammersmith and Fulham

  • 2021/00222/TEL56 Awaiting decision

    Telephone Exchange 32 - 36 Peterborough Road London SW6 3BN

    Removal of the redundant existing steelwork from the rooftop, relocation of 10no existing antenna and 2no existing 0.3m dish antenna from the existing steelwork onto the new steelwork design, installation of 6no antennas, 2no 0.3m dish antenna and 1no GPS Module, a new hooped CAT access ladder to the new support system, a new GRP access platform located next to 1no new ERS Outdoor cabinet, 1no CSC outdoor cabinet and 1no Distribution board at main roof level; replacement of 1no single user to 1no multi user meter cabinet at ground floor level; associated development thereto.

    22 Jan 2021 Telecoms
  • Pavement Outside 17-25 Farm Lane London SW6 1PX London SW6 1PA

    Installation of 1no. 20m high Phase 8 Monopole with a wraparound cabinet at the base; and associated ancillary works.

    29 May 2020 Telecoms
  • Novotel 1 Shortlands London W6 8DR

    Installation of an upgrade to existing telecommunications equipment at roof level; including the installation of 1no. aperture antenna on a face fixed support pole and 2no. aperture antennas on an "H" frame support pole attached to the wall of an existing plantroom; installation of 1no. aperture antenna on a face fixed support pole and 2no. aperture antennas on an "H" frame support pole attached to the wall of the other existing plantroom; installation of 1no. H3G GPS module on top of an aperture antenna support pole; installation of 1no. EE GPS module on top of aperture antenna support pole; installation of additional equipment cabinets; and associated ancillary works.

    29 May 2020 Telecoms
  • 2020/01852/TEL56 Awaiting decision

    Outside John Betts House Rylett Road London W12 9NJ

    Installation of a freestanding 18m Phase 8 Monopole with wraparound base cabinet, installation of 3no equipment cabinets and associated ancillary works.

    20 Jul 2020 Telecoms
  • 2020/01561/TEL56 Awaiting decision

    Cambridge House 100 Cambridge Grove London

    Installation of an upgrade to existing telecommunications equipment at roof level; including the installation of 6no. new aperture antennas on new support poles fixed to the rooftop; and associated ancillary development, all at roof level.

    19 Jun 2020 Telecoms