Skip to content
PlanIndex Get alerts
Menu

Planning application

4 Ranelagh Gardens London SW6 3PA

Granted Hammersmith and Fulham 2002/00769/FUL Full Detailed Planning Application

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a rear extension at upper ground floor level, on top of the existing back addition; erection of a rear spiral staircase; installation of a new staircase in existing front lightwell; installation of new windows at ground and first floor, on the side flank elevation; alterations to side boundary wall increasing height by 0.2 metres.

As published by the council, reference 2002/00769/FUL

Application record

Reference
2002/00769/FUL
Type
Full Detailed Planning Application
Status
Application Approved
Decision
Application Approved
Received
16 May 2002
Validated
16 May 2002
Decided
11 Jun 2002
Ward
Palace Riverside
Decision by
Delegated Decision
Postcode
SW6 3PA

Timeline

Dates from the published record

  1. 16 May 2002

    Received by Hammersmith and Fulham

  2. 11 Jun 2002

    Decision issued: Application Approved

  3. 22 Aug 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Hammersmith and Fulham

  • 343 Fulham Palace Road, London, SW6 6TD

    Installation of a new structure with door opening and the erection of obscure glazed screen around part of the flat roof at third floor level to the rear elevation in connection with its use as a terrace.

    30 Apr 2026 Full applications
  • 24-26 Matheson Road, London, W14 8SW

    Replacement of existing vehicular entrance gates with new vehicular entrance gates and railings in between building no. 24-26 Matheson Road and no. 32 Matheson Road; installation of a pedestrian entrance gate in between building no. 24-26 Matheson Road and no. 22 Matheson Road.

    15 Jun 2026 Full applications
  • 10 Cathnor Road, London, W12 9JA

    Replacement of existing single glazed timber framed sash windows to the front elevation with double glazed timber framed sash windows and the existing single glazed rear elevations with new double glazed timber sash windows; and replacement of existing single glazed timber framed basement entrance door to the rear elevation with a new double glazed composite GRP door.

    26 Jun 2026 Full applications
  • 44 Flat B,Studland Street,London,Hammersmith And Fulham,W6 0JS

    Replacement of all existing timber framed windows at first floor level with new double glazed timber framed windows. Replacement of existing rooflight to the roof of the rear back addition.

    24 Apr 2026 Full applications
  • 59A Chesson Road, London, W14 9QT

    Erection of an additional floor at roof level.

    24 Jun 2026 Full applications