Sutton International Ltd Gorsey Lane Widnes Cheshire WA8 0GG

Granted Halton 24/00407/PRIOR Prior Notification apps

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application to determine if prior approval is required for a proposed installation of roof mounted solar PV arrays at

As published by the council, reference 24/00407/PRIOR

Application record

Reference
24/00407/PRIOR
Type
Prior Notification apps
Status
Decided
Decision
Granted As published: Agr, Dem, Tel - approval not required
Received
29 Oct 2024
Validated
29 Oct 2024
Decided
5 Dec 2024
Ward
Halton View
Parish
No Parish
Decision by
Delegated Decision
Postcode
WA8 0GG

Timeline

Dates from the published record

  1. 29 Oct 2024

    Received by Halton

  2. 5 Dec 2024

    Decision issued: Agr, Dem, Tel - approval not required

  3. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

  • DECISION NOTICE Decision / Officer Report · 05 Dec 2024
  • APPLICATIONFORMREDACTED Application Form · 29 Oct 2024
  • GORSEY LANE - RED LINED PLAN Plans · 29 Oct 2024
  • QCELLS_DATA_SHEET_Q.PEAK_DUO_M-G11S_SERIES_400-420_2023-03_REV03_EN (3) Supporting Documents · 29 Oct 2024
  • GORSEY LANE - ELEVATIONS DIAGRAM Plans · 29 Oct 2024
  • GORSEY LANE- LOCATION Supporting Documents · 29 Oct 2024
  • GORSEY LANE FLAT ROOF PROFILE Plans · 29 Oct 2024
  • GORSEY LANE - PV LAYOUT Plans · 29 Oct 2024
  • GORSEY LANE -TECHNICAL OVERVIEW DOC Supporting Documents · 29 Oct 2024
  • SUPPORTING STATEMENT Supporting Documents · 29 Oct 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Halton granted permission on 5 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Saffil Ltd Pilkington Sullivan Site Sullivan Road Widnes WA8 0US

    22/00369/FULEIA Submitted 12 Jul 2022 200 yards away

    Proposed installation of an additional production line, involving an extension to an existing building and the installation of associated plant and machinery at

    Granted Outline Extension 18 docs
  • Bowman Works Gorsey Lane Widnes Cheshire WA8 0YZ

    22/00533/S73 Submitted 12 Oct 2022 250 yards away

    Application under Section 73 of the Town and Country Planning Act to amend the time period for implementation of conditions 9, 10, 11b and 12 of Planning Permission 21/00498/FUL (Proposed erection of industrial/storage building for use class B2 / B8 purposes, parking and servicing areas, bunds, fencing, landscaping, ancillary works and retrospective permission for the retention of previously installed bunds) to 28th May 2023 in respect of each condition at

    Granted Conditions 3 docs
  • Bowman Works Gorsey Lane Widnes Cheshire WA8 0YZ

    24/00379/S73 Submitted 1 Oct 2024 250 yards away

    Application under Section 73 of the Town and Country Planning Act to vary Conditions 10, 11B and 12 of Planning Application 21/00498/FUL to extend the time to complete the works to 30th June 2025 at

    Granted Conditions 4 docs
  • Bowman Works Gorsey Lane Widnes Cheshire WA8 0YZ

    24/00312/COND Submitted 9 Aug 2024 250 yards away

    Application to discharge condition no. 13 (Site Levels Details) of planning permission 21/00498/FUL at

    Granted Conditions 4 docs
  • Bowman Works Gorsey Lane Widnes Cheshire WA8 0YZ

    23/00068/S73 Submitted 24 Feb 2023 250 yards away

    Application under Section 73 of the Town & Country Planning Act to vary the wording of condition 13 of Planning Application 22/00269/S73 to be amended to read: By 28th November 2023 full details of the existing and proposed site levels (including the proposed car parking and service areas), above ordnance datum, shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved levels

    Granted Conditions 3 docs
  • Unifrax Corporation Sullivan Road Widnes Cheshire WA8 0US

    21/00368/FUL Submitted 16 Jun 2021 300 yards away

    Proposed demolition of existing wall and replacement with 2.420 metre high palisade fencing at

    Granted Full applications Demolition 6 docs

In Halton

  • 23/00125/PRIOR Granted

    The Innovation Centre Daresbury Science Park Keckwick Lane Daresbury Warrington Cheshire WA4 4FS

    Proposed installation of a 130 panel roof mounted solar array to produce 65kWh power at

    Received 26 Mar, published by the council 16 Sep 2026 Prior approval
  • 23/00069/PRIOR Granted

    Riverside College Kingsway Widnes Cheshire WA8 7QQ

    Prior notification for a proposed two storey extension to existing Engineering Building to create an Engineering Workshop at

    Received 23 Feb, published by the council 29 Jul 2026 Prior approval
  • 23/00057/PRIOR Granted

    Cavendish High Academy Lincoln Close Runcorn Cheshire WA7 4YX

    Prior notification of proposed remodelling of school to include removal of a redundant garage, and the erection of a two classroom extension at

    Received 14 Feb, published by the council 29 Jul 2026 Prior approval
  • 23/00040/PRIOR Withdrawn

    51 - 53 Halton Road Runcorn Cheshire WA7 5QU

    Prior notification for proposed installation of In Post Parcel Locker at

    Received 19 Jan, published by the council 21 Jul 2026 Prior approval
  • 21/00492/PRIOR Granted

    Cornwall Road / Alder Avenue Widnes Cheshire

    Prior notification of intent to utilise Permitted Development Rights under Part 18 of the General Permitted Development Order for works to replace the existing footbridge together with associated works to the footpath, fencing, lighting and ancillary development at

    Received 10 Aug, published by the council 2 Oct 2026 Prior approval