Skip to content
PlanIndex Get alerts
Menu

Planning application

2026/0506

Flat 1, 1 Downs Road, Hackney, London, E5 8QJ

Granted Hackney Full Planning Permission

Proposal

Conversion of existing window at lower ground floor level on the rear elevation with a set of double glazed doors

As published by the council, reference 2026/0506

Timeline

Dates from the published record

  1. 9 Mar 2026

    Received by Hackney

  2. 24 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/2708 Status unknown

    The Nightingale Estate Downs Road, Hackney, E5 8QH

    Section 73 application to vary condition 2 (approved plans) of planning permission 2016/2841 dated 06.02.2018, as amended for ‘ Demolition of existing buildings and structures in and around Olympus Square and the construction of mixed tenure dwellings (use class C3); mixed retail/ cafe floorspace (use class E); community use (use class F2(b)); a management office (use class E); new pedestrian and vehicular access routes; car parking; landscape and public realm improvements; refurbishment works associated with the ground floor entrance lobby and podium of the existing Seaton Point tower and all associated infrastructure.’ The effect of the variation would be to bring Block E into Phase 1 of the development and amend Block E's design, with the main design changes consisting of: alterations to internal arrangements to comply with new building safety requirements; alterations to the external appearance; a change to the use of two ground floor commercial units to two 1-bed flats; alterations to the landscaping and play space; amendments to the road layout; and an energy strategy update.

    10 Dec 2025 62m away Amendments
  • 2025/2606 Granted

    The Nightingale Estate Downs Road, London, E5 8QH

    Non-material amendments to planning permission 2016/2841 dated 06/02/2018 comprising the following changes to the description of development: clarify construction is phased; update use classes to reflect updates to the Use Class Order (2020); and remove reference to the number of homes and floorspace area and instead include a condition setting out consented quantums of development.

    27 Nov 2025 62m away Amendments
  • 2026/0048 Granted

    Lee House, 6-6a Rectory Road, Hackney, London, N16 7QS

    Approval of details of condition 3 (materials) related to planning application 2025/0986, dated 28/11/2025.

    9 Jan 2026 134m away Conditions
  • 2026/0051 Granted

    Lee House, 6-6a Rectory Road, Hackney, London, N16 7QS

    Submission of details pursuant to condition 4 (drainage), 5 (External Lighting), 6 (Landscaping Scheme), 7 (BNG Plan) & 8 (Habitat Management & Monitoring Plan) of planning permission 2025/0986, dated 28 November 2025

    9 Jan 2026 134m away Conditions
  • 2026/0597 Granted

    Lee House Employment And Rehabilitation Centre, 6 Rectory Road, Hackney, London, N16 7QS

    Non-material amendment to planning permission ref 2025/0986 dated 28/11/2025 comprising relocation of gate piers.

    19 Mar 2026 134m away Amendments
  • 2025/2098 Withdrawn

    Launderette, 253 Amhurst Road, Hackney, London, N16 7UN

    Application for a Certificate of Lawfulness for the proposed change of use involving the incorporation of the vacant ground floor commercial unit (formerly Use Class E) into the existing residential flat (Use Class C3) to form an enlarged single dwelling.

    22 Sep 2025 211m away Lawful development

In Hackney

  • 2026/1385 Status unknown

    368 Mare Street, Hackney, London, E8 1HR

    Retrospective application for the installation of 1nr air conditioning condenser unit on flat roof to rear of property

    24 Jun 2026 Full applications
  • 2026/1368 Status unknown

    Flat 1, 59 Springdale Road, Hackney, London, N16 9NT

    Erection of single storey outbuilding in rear garden.

    22 Jun 2026 Full applications
  • 2026/1339 Status unknown

    The White Hart, WHITE HART, 69 Stoke Newington High Street, Hackney, London, N16 8EL

    Installation of a replacement free-standing multi-functional communication hub, comprising defibrillator, digital advertisement display and telephone

    19 Jun 2026 Full applications
  • 2026/1344 Status unknown

    Benthal Primary School, BENTHAL PRIMARY SCHOOL Benthal Road, Hackney, London, N16 7AU

    Removal of existing single-pane steel Crittall style windows. - Localised removal of textured asbestos ceiling portions. - Installation of a new set of replacement double-glazed aluminium window units with transoms/mullions to match existing. - Making good of internal/external areas affected by window replacement. - Localised repairs to key areas of structure. Infant School - Replacement of existing rooflight hinges/hardware and with new components. - Application of G-Value solar control film to rooflight glazing.

    19 Jun 2026 Full applications
  • 2026/1334 Status unknown

    OUTSIDE 141 Stamford Hill, Hackney, London, N16 5LG

    Installation of new communications kiosk with integrated advertising display and defibrillator to replace existing Kiosk, plus associated Telephone kiosk removal.

    19 Jun 2026 Full applications