Planning application
2025/2846
31 Spring Hill, Hackney, London, E5 9BE
Proposal
Erection of a joint full width ground floor rear extension with sukkah roof, joint first floor rear extensions and hip to gable roof alteration; erection of a front and rear roof dormer with insertion of rooflights and insertion of window to front gable
As published by the council, reference 2025/2846
Timeline
Dates from the published record
-
22 Dec 2025
Received by Hackney
-
24 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2025/2174 Granted
31 Spring Hill, Hackney, London, E5 9BE
Erection of a two storey rear extension, hip to gable roof alteration; erection of a front and rear dormers with insertion of rooflights
-
2026/1211 Status unknown
46 Clapton Common, Hackney, London, E5 9BA
Alterations to the roof formation to provide a first floor to the existing outbuilding.
-
2026/0646 Granted
8 Ashtead Road, Hackney, London, E5 9BH
Proposed infill of the first-floor rear extension.
-
2026/0518 Status unknown
8 Ashtead Road, Hackney, London, E5 9BH
Submission of details pursuant to conditions 3 (SUDs) and 4 (Drainage) attached to planning permission ref 2025/1435 dated 11/12/2025 & 2026/0646 dated 13/05/2026.
-
2026/1134 Status unknown
36 Ashtead Road, Hackney, London, E5 9BH
Excavation of rear basement and rear lightwell creation; Erection of a single storey ground floor rear extension
-
2026/0666 Status unknown
34 Ashtead Road, Hackney, London, E5 9BH
Erection of part single part two storey rear extension to No. 36 and first floor rear extension to No. 34 (Amended description)
Other full applications applications
In Hackney
-
2026/1385 Status unknown
368 Mare Street, Hackney, London, E8 1HR
Retrospective application for the installation of 1nr air conditioning condenser unit on flat roof to rear of property
-
2026/1368 Status unknown
Flat 1, 59 Springdale Road, Hackney, London, N16 9NT
Erection of single storey outbuilding in rear garden.
-
2026/1339 Status unknown
The White Hart, WHITE HART, 69 Stoke Newington High Street, Hackney, London, N16 8EL
Installation of a replacement free-standing multi-functional communication hub, comprising defibrillator, digital advertisement display and telephone
-
2026/1344 Status unknown
Benthal Primary School, BENTHAL PRIMARY SCHOOL Benthal Road, Hackney, London, N16 7AU
Removal of existing single-pane steel Crittall style windows. - Localised removal of textured asbestos ceiling portions. - Installation of a new set of replacement double-glazed aluminium window units with transoms/mullions to match existing. - Making good of internal/external areas affected by window replacement. - Localised repairs to key areas of structure. Infant School - Replacement of existing rooflight hinges/hardware and with new components. - Application of G-Value solar control film to rooflight glazing.
-
2026/1334 Status unknown
OUTSIDE 141 Stamford Hill, Hackney, London, N16 5LG
Installation of new communications kiosk with integrated advertising display and defibrillator to replace existing Kiosk, plus associated Telephone kiosk removal.