Skip to content
PlanIndex Get alerts
Menu

Planning application

2025/2192

158 Upper Clapton Road, Hackney, London, E5 9JZ

Granted Hackney Full Planning Permission

Proposal

Replacement of existing timber sash and casement windows with uPVC double glazed units.

As published by the council, reference 2025/2192

Timeline

Dates from the published record

  1. 3 Oct 2025

    Received by Hackney

  2. 24 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/2175 Status unknown

    160 Upper Clapton Road, Hackney, London, E5 9JZ

    Submission of details to discharge condition 3 (Flood risk Assessment), Condition 4 (Construction Management Plan), condition 5 (Cycle Parking) and condition 6 (Refuse and Recycling) of planning permission 2022/2244 dated 19/06/2025

    6 Oct 2025 0m away Conditions
  • 2025/2859 Refused

    148 - 150 Upper Clapton Road, Hackney, London, E5 9JZ

    Erection of a double-storey extension to existing Synagogue, basement excavation and alterations to fenestration and facades.

    24 Dec 2025 0m away Full applications
  • 2025/2194 Granted

    41 Knightland Road, Hackney, London, E5 9HR

    The proposal replaces the existing timber sash and casement windows with modern uPVC double glazed units. Elevations and window schedule appended to this application.

    3 Oct 2025 35m away Full applications
  • 2026/0102 Granted

    First Floor And Second Floor Flat, 95 Upper Clapton Road, Hackney, London, E5 9BU

    Certificate of Lawful Use (Existing) for the retention of rear building as Office Use (Class E)

    16 Jan 2026 72m away Lawful development
  • 2025/2117 Refused

    20 Mount Pleasant Lane, Hackney, London, E5 9DN

    Erection of a ground floor rear extension with sukkah roof

    25 Sep 2025 185m away Householder
  • 2026/0535 Granted

    22 Mount Pleasant Lane, Hackney, London, E5 9DN

    Submission of details pursuant to condition 6 (SUDS) attached to planning permission ref 2025/2371 dated 02/02/2026.

    12 Mar 2026 185m away Conditions

In Hackney

  • 2026/1385 Status unknown

    368 Mare Street, Hackney, London, E8 1HR

    Retrospective application for the installation of 1nr air conditioning condenser unit on flat roof to rear of property

    24 Jun 2026 Full applications
  • 2026/1368 Status unknown

    Flat 1, 59 Springdale Road, Hackney, London, N16 9NT

    Erection of single storey outbuilding in rear garden.

    22 Jun 2026 Full applications
  • 2026/1339 Status unknown

    The White Hart, WHITE HART, 69 Stoke Newington High Street, Hackney, London, N16 8EL

    Installation of a replacement free-standing multi-functional communication hub, comprising defibrillator, digital advertisement display and telephone

    19 Jun 2026 Full applications
  • 2026/1344 Status unknown

    Benthal Primary School, BENTHAL PRIMARY SCHOOL Benthal Road, Hackney, London, N16 7AU

    Removal of existing single-pane steel Crittall style windows. - Localised removal of textured asbestos ceiling portions. - Installation of a new set of replacement double-glazed aluminium window units with transoms/mullions to match existing. - Making good of internal/external areas affected by window replacement. - Localised repairs to key areas of structure. Infant School - Replacement of existing rooflight hinges/hardware and with new components. - Application of G-Value solar control film to rooflight glazing.

    19 Jun 2026 Full applications
  • 2026/1334 Status unknown

    OUTSIDE 141 Stamford Hill, Hackney, London, N16 5LG

    Installation of new communications kiosk with integrated advertising display and defibrillator to replace existing Kiosk, plus associated Telephone kiosk removal.

    19 Jun 2026 Full applications