Skip to content
PlanIndex Get alerts
Menu

Planning application

129 Balls Pond Road, Hackney, London, N1 4BG

Status unknown Hackney 2025/1984 Listed Building Consent

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of protective front balustrade and handrail; replacement of lower ground floor front window grille; installation of gas boiler beneath front steps; replacement of existing second-floor windows with timber sash windows; replacement of existing rear single-storey flat roof extension with pitched roof extension, timber sash window, and rooflight; internal alterations to form new openings and removal of cupboards/doors to expose original chimney breasts; and re-routing of soil vent pipe internally.

As published by the council, reference 2025/1984

Application record

Reference
2025/1984
Type
Listed Building Consent
Received
8 Sep 2025
Ward
De Beauvoir Ward
Postcode
N1 4BG

Site history

Applications at this address on the Hackney register

This site has had 4 applications since 2025: 2 approved, 0 refused.

  • 2026/0867 Status unknown

    129 Balls Pond Road, Hackney, London, N1 4BG

    Submission of detail pursuant to Condition 3 part 1 (Details and Materials) attached to planning permission Ref. 2025/1983 dated 20/01/2026.

    Submitted 22 Apr 2026 Conditions
  • 2026/0654 Granted

    129 Balls Pond Road, Hackney, London, N1 4BG

    Submission of detail pursuant to Condition 3 Parts 2, 3 and 4 (Details and Materials) attached to planning permission Ref. 2025/1983 dated 20/01/2026.

    Submitted 26 Mar 2026 Conditions
  • 2025/1983 Granted

    129 Balls Pond Road, Hackney, London, N1 4BG

    Installation of protective front balustrade and handrail; installation of gas boiler beneath front steps; replacement of existing rear single-storey flat roof extension with pitched roof extension, timber sash window, and rooflight; internal alterations to form new openings and removal of cupboards/doors to expose original chimney breasts; and re-routing of soil vent pipe internally.

    Submitted 8 Sep 2025 Householder

Timeline

Dates from the published record

  1. 8 Sep 2025

    Received by Hackney

  2. 9 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 3 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

Checking the current position

The published feed does not show a live status for this application; the register on Hackney's own portal holds the authoritative version.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 151 Balls Pond Road, Hackney, London, N1 4BG

    2025/2831 Submitted 22 Dec 2025 0m away

    Decision due ~16 Feb

    Demolition of existing outbuilding and construction of a three storey plus basement dwellinghouse with associated refuse and cycle storage and the installation of solar PV panels

    Status unknown Full applications Demolition
    Small domestic
  • 129 Balls Pond Road, Hackney, London, N1 4BG

    2026/0867 Submitted 22 Apr 2026 0m away

    Decision due ~17 Jun

    Submission of detail pursuant to Condition 3 part 1 (Details and Materials) attached to planning permission Ref. 2025/1983 dated 20/01/2026.

    Status unknown Conditions
  • 145 Balls Pond Road, Hackney, London, N1 4BG

    2025/2438 Submitted 4 Nov 2025 0m away

    Refurbishment of bathroom, WC and kitchen, redecoration throughout

    Granted Heritage and listed buildings
  • 151 Balls Pond Road, Hackney, London, N1 4BG

    2026/0863 Submitted 21 Apr 2026 0m away

    To reduce Purple Leaved Cherry Plum (T003 on the plan) by approx. 1m on the East side (where it extends over the neighbours boundary) and approx. 3m on the west side by removing lower limb. Pruning to reduce height / crown by approx 20-25%.

    Granted Trees
  • 125 Balls Pond Road, Hackney, London, N1 4BG

    2025/2211 Submitted 7 Oct 2025 0m away

    Demolition of existing lower ground floor extension and erection of a full-width lower ground floor rear extension including a new rear window, internal alterations, and alterations to the rear garden.

    Withdrawn Householder Extension Demolition +1
    Domestic
  • 125 Balls Pond Road, Hackney, London, N1 4BG

    2025/2212 Submitted 7 Oct 2025 0m away

    Demolition of existing lower ground floor rear extension and erection of a full-width lower ground floor rear extension including a new rear window, internal alterations, and alterations to the rear garden.

    Withdrawn Heritage and listed buildings Extension Demolition +1

In Hackney

  • 2026/1428 Status unknown

    Unit 34b Schooner Court, WATERSIDE, 44 - 48 Wharf Road, Hackney, London, N1 7UX

    Listed building consent for internal alterations comprising the installation of a new kitchen and bathroom, replacement floor finishes, and associated internal redecoration throughout the property

    30 Jun 2026 Heritage and listed buildings
  • 2026/1376 Status unknown

    21 Northchurch Terrace, Hackney, London, N1 4EB

    Listed Building Consent for repairs to the boundary wall, including the use of Helibars and Lime mortar for repointing.

    23 Jun 2026 Heritage and listed buildings
  • 2026/1273 Status unknown

    15 Dericote Street, Hackney, London, E8 4PG

    Lower ground floor rear extension, new windows, internal alterations including internal wall insulation to external walls

    15 Jun 2026 Heritage and listed buildings
  • 2026/1206 Status unknown

    Rochester Castle, 145 Stoke Newington High Street, Hackney, London, N16 0NY

    Proposed kitchen extract to existing commercial kitchen to rear, alterations to existing customer area bar and staff facilities

    4 Jun 2026 Heritage and listed buildings
  • 2026/1162 Status unknown

    9 De Beauvoir Square, Hackney, London, N1 4LG

    Retention of a steel purlin and supporting steel column within the attic space, installed to provide necessary structural support to the existing pitched roof.

    29 May 2026 Heritage and listed buildings