Planning application
191 Lower Clapton Road, Hackney, London, E5 8EG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Reinstatement of timber structure and enclosing the roof. (Part retrospective)
As published by the council, reference 2025/1935
Application record
- Reference
- 2025/1935
- Type
- Full Planning Permission
- Status
- Conditions
- Decision
- Granted - Extra Conditions
- Received
- 2 Sep 2025
- Ward
- Hackney Downs Ward
- Postcode
- E5 8EG
Timeline
Dates from the published record
-
2 Sep 2025
Received by Hackney
-
9 Aug 2026
Added to PlanIndex
What this grant of permission means
Hackney granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
201 Lower Clapton Road, Hackney, London, E5 8EG
Decision due ~12 Feb
Installation of Smart Hub Unit with integrated digital screens
Status unknown Full applications -
197 Lower Clapton Road, Hackney, London, E5 8EG
Decision due ~24 Jul
Use of the ground floor as a cafe/restaurant (Class E) and an extraction system with proposed extraction measures (Part retrospective/ part proposed)
Status unknown Full applications -
25 Powell Road, Hackney, London, E5 8DJ
Proposed single storey rear wrap-around extension in the rear garden
Granted Householder ExtensionSmall domestic -
5 Powell Road, Hackney, London, E5 8DJ
Decision due ~20 Jul
Erection of single storey ground floor rear extension to form a single story ground floor wraparound extension with rooflight.
Status unknown Householder Extension Loft or dormerSmall domestic -
17 Powell Road, Hackney, London, E5 8DJ
Submission of details pursuant to condition 4 (swift bricks/boxes) attached to planning permission 2025/2540 dated 14/01/2026
Granted Conditions -
A And G Metal Works, GROUND FLOOR REAR OF 11 Powell Road, Hackney, London, E5 8DJ
Decision due ~19 Jan
Submission of details pursuant to conditions 11 (Overheating), 12 (SuDS) and 13 (Flood Risk) attached to planning permission ref 2024/0900 dated 11/06/2025.
Status unknown Conditions
Other full applications
In Hackney
-
2026/1385 Status unknown
368 Mare Street, Hackney, London, E8 1HR
Retrospective application for the installation of 1nr air conditioning condenser unit on flat roof to rear of property
-
2026/1368 Status unknown
Flat 1, 59 Springdale Road, Hackney, London, N16 9NT
Erection of single storey outbuilding in rear garden.
-
2026/1339 Status unknown
The White Hart, WHITE HART, 69 Stoke Newington High Street, Hackney, London, N16 8EL
Installation of a replacement free-standing multi-functional communication hub, comprising defibrillator, digital advertisement display and telephone
-
2026/1344 Status unknown
Benthal Primary School, BENTHAL PRIMARY SCHOOL Benthal Road, Hackney, London, N16 7AU
Removal of existing single-pane steel Crittall style windows. - Localised removal of textured asbestos ceiling portions. - Installation of a new set of replacement double-glazed aluminium window units with transoms/mullions to match existing. - Making good of internal/external areas affected by window replacement. - Localised repairs to key areas of structure. Infant School - Replacement of existing rooflight hinges/hardware and with new components. - Application of G-Value solar control film to rooflight glazing.
-
2026/1334 Status unknown
OUTSIDE 141 Stamford Hill, Hackney, London, N16 5LG
Installation of new communications kiosk with integrated advertising display and defibrillator to replace existing Kiosk, plus associated Telephone kiosk removal.