Skip to content
PlanIndex Get alerts
Menu

Planning application

Unit 7B, Henley Business Park, Pirbright Road, Normandy, Guildford, GU3 2DX

Awaiting decision Guildford 26/P/01047

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of 3 blocks of roof mounted solar PV with a ground floor hybrid energy storage cabinet.

As published by the council, reference 26/P/01047

Application record

Reference
26/P/01047
Status
Registered
Received
3 Aug 2026
Validated
3 Aug 2026
Ward
Normandy & Pirbright
Parish
Normandy
Decision by
Delegated
Postcode
GU3 2DX

Timeline

Dates from the published record

  1. 3 Aug 2026

    Received by Guildford

  2. 7 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Guildford took a median of 63 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

3 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

  • Application form redacted Application Form · 03 Aug 2026
  • Solax ess-aelio technical specification sheet Application Document · 03 Aug 2026
  • Design and access statement Application Document · 03 Aug 2026
  • Proposed site plan Drawing · 03 Aug 2026
  • Existing side elevations Drawing · 03 Aug 2026
  • Existing side 2 elevations Drawing · 03 Aug 2026
  • Existing rear elevations Drawing · 03 Aug 2026
  • Existing front elevations Drawing · 03 Aug 2026
  • Proposed side elevations Drawing · 03 Aug 2026
  • Proposed rear elevations Drawing · 03 Aug 2026
  • Proposed front elevations Drawing · 03 Aug 2026
  • Location plan Drawing · 03 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Guildford for determination, against a statutory target of eight weeks. Over the last year Guildford's median decision took 63 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Guildford's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Henley Business Park, Pirbright Road, Normandy, Guildford, GU3 2DX

    26/P/00244 Submitted 24 Feb 2026 0m away

    Certificate of Lawfulness for a proposed development to establish whether the installation of Solar PV on the roof, together with associated battery storage would be lawful

    Split decision Lawful development 16 docs
  • Unit 1c, Henley Business Park, Pirbright Road, Normandy, Guildford, GU3 2DX

    26/P/00948 Submitted 13 Jul 2026 0m away

    86% historically approved · decision due ~17 Sep

    Install SolaX AELIO-P50B200 Hybrid Energy Storage Cabinet at ground level local to the industrial...

    Awaiting decision 16 docs
  • Deer Springs, Henley Park, Normandy, Guildford, GU3 2BZ

    24/T/00262 Submitted 14 Oct 2024 164m away

    T1 - Oak - Reduce back lateral branches to give approximately 2m clearance from proprieties. G1 - Oaks/Sweet chestnuts/Hazels - Crown lift to approximately 5/6m above ground level to remove branches touching wall to prevent further damage (TPO P1/201/360)..

    Granted Trees 8 docs